Permit: TC-COM-0423-01044
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
2465 N HUACHUCA DR BLDG 1
Address NEW:
2465 N HUACHUCA DR BLDG 1
Apply Date:
04/12/2023
Applicant:
Brandon Azevedo
Description:
170/100 76.5 KW - Roof Mount- Solar PV system for the INDUSTRIAL BUILDING/Building #1 per permit description. ( Address Bldg. #1) I had to withdraw the previous permit # TCM-COM-122200345, due design changes and wrong address. It was easier to start over, with new app. than to try and correct old info. This app and Bldg. is one of three separate Solar applications for 3 separate meters and bldgs. on the same property.
Permit Reviews
Permit Number - TC-COM-0423-01044
Permit Status: Inspections complete
Permit Description: 170/100 76.5 KW - Roof Mount- Solar PV system for the INDUSTRIAL BUILDING/Building #1 per permit description.
( Address Bldg. #1) I had to withdraw the previous permit # TCM-COM-122200345, due design changes and wrong address. It was easier to start over, with new app. than to try and correct old info.
This app and Bldg. is one of three separate Solar applications for 3 separate meters and bldgs. on the same property.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/10/2024 | COMMERCIAL REVIEW - FULL v.4 | 07/11/2024 | APPROVED |
| 04/18/2023 | COMMERCIAL REVIEW - FULL v.1 | 05/19/2023 | REQUIRES RESUBMIT |
| 10/09/2023 | COMMERCIAL REVIEW - FULL v.4 | 11/07/2023 | APPROVED |
| 03/25/2024 | COMMERCIAL REVIEW - FULL v.3 | 04/29/2024 | REQUIRES RESUBMIT |
| 01/31/2024 | COMMERCIAL REVIEW - FULL v.1 | 01/31/2024 | REQUIRES RESUBMIT |
| 11/07/2023 | RESTAMP - COMMERCIAL v.1 | 11/09/2023 | APPROVED |
| 06/09/2023 | COMMERCIAL REVIEW - FULL v.2 | 06/09/2023 | REQUIRES RESUBMIT |
| 06/12/2023 | COMMERCIAL REVIEW - FULL v.3 | 07/17/2023 | REQUIRES RESUBMIT |
| 03/25/2024 | COMMERCIAL REVIEW - FULL v.2 | 03/25/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0423-01044
Permit Status: Inspections complete
Permit Description: 170/100 76.5 KW - Roof Mount- Solar PV system for the INDUSTRIAL BUILDING/Building #1 per permit description.
( Address Bldg. #1) I had to withdraw the previous permit # TCM-COM-122200345, due design changes and wrong address. It was easier to start over, with new app. than to try and correct old info.
This app and Bldg. is one of three separate Solar applications for 3 separate meters and bldgs. on the same property.
| Date | Description | Comments |
|---|---|---|
| 11/09/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0423-01044
Permit Description: 170/100 76.5 KW - Roof Mount- Solar PV system for the INDUSTRIAL BUILDING/Building #1 per permit description.
( Address Bldg. #1) I had to withdraw the previous permit # TCM-COM-122200345, due design changes and wrong address. It was easier to start over, with new app. than to try and correct old info.
This app and Bldg. is one of three separate Solar applications for 3 separate meters and bldgs. on the same property.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2024 | BULD - Electrical Clearance | Passed | 8/824 - Clear DGC/DGL for building #1 - industrial building CLEAR DGC/DGL |
|
| 08/08/2024 | COT - LCBU - Building Final | Passed | Project complete. CLOSE PERMIT |
|
| 08/08/2024 | COT - CSOL - Electrical Final Solar Project | Passed | Project complete | |
| 08/08/2024 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
| 08/08/2024 | COT - CSOL - Electrical Progress Solar Project | Passed | ||
| 08/08/2024 | COT - CSOL - Electrical Underground Solar Project | Passed | ||
| 08/08/2024 | COT - CSOL - Grounding/Bonding Solar Project | Passed |