Permit: TC-COM-0423-01033
Permit Details
Apply Date:
04/11/2023
Applicant:
Corky Poster
Description:
EXISTING BLDG 10, REHAB, 5517 SF, 5 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Permit Reviews
Permit Number - TC-COM-0423-01033
Permit Status: Issued
Permit Description: EXISTING BLDG 10, REHAB, 5517 SF, 5 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/27/2023 | COMMERCIAL REVIEW - FULL v.2 | 07/03/2023 | APPROVED |
04/27/2023 | COMMERCIAL REVIEW - FULL v.1 | 05/30/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0423-01033
Permit Status: Issued
Permit Description: EXISTING BLDG 10, REHAB, 5517 SF, 5 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Total Outstanding Activity Conditions - 14
Date | Name |
---|---|
06/16/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. |
06/16/2023 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
06/16/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
06/16/2023 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
06/16/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
06/16/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
06/16/2023 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
06/16/2023 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
06/16/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
06/16/2023 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
06/16/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
06/16/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
06/26/2023 | Prior to project being finalized applicant must provide new water easement recordation information |
07/28/2023 | Verify that Permit #P23SD00041 - Milagro on Oracle - Public Sewer is issued and all fees are paid – Waste water receipt |
Conditions
Permit Number - TC-COM-0423-01033
Permit Status: Issued
Permit Description: EXISTING BLDG 10, REHAB, 5517 SF, 5 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Date | Description | Comments |
---|---|---|
04/27/2023 | Please contact Pima County Addressing to resolve your addressing issue related to FILL IN THIS SPACE. Addressing@pima.gov or 520-724-9512 | |
04/27/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
06/16/2023 | NESHAP Permit is required. (Utilized with commercial demolition permits) |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0423-01033
Permite Description: EXISTING BLDG 10, REHAB, 5517 SF, 5 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Total Outstanding Inspections - 10
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/29/2024 | COT - BULD - SWG Clearance | N/A | Canceled | 1/29/24: Not ready for SWG Clearance at this time. |
07/11/2024 | COT - HCPL - Plumbing Intermediate | N/A | Re-inspection required | 7/1/24: M.E.P inspection failed, secure electrical wiring 8" from receptacles, DVW not under test, Domestic water not under test, seal all penetrations through vapor barrier and top plates throughout, nail plates missing throughout, exhaust fans not wired in, grounding at electrical panels must be installed correctly, low voltage boxes not roughed in, properly terminate electrical wiring in boxes (sheathing must extend 1/2" into box), damaged wiring must be replaced, knockouts at panel must be sealed, Condensate drain must be appropriately supported midway in walls, fire blocking required at soffit. (All units except commercial unit. 7/11/24: seal all penetrations through vapor barrier, seal all penetrations through top plate, secure electrical wiring 8"from box, nail plates missing throughout. Per previous Notes. STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
07/11/2024 | COT - HCME - Mechanical Intermediate | N/A | Re-inspection required | 7/1/24: M.E.P inspection failed, secure electrical wiring 8" from receptacles, DVW not under test, Domestic water not under test, seal all penetrations through vapor barrier and top plates throughout, nail plates missing throughout, exhaust fans not wired in, grounding at electrical panels must be installed correctly, low voltage boxes not roughed in, properly terminate electrical wiring in boxes (sheathing must extend 1/2" into box), damaged wiring must be replaced, knockouts at panel must be sealed, Condensate drain must be appropriately supported midway in walls, fire blocking required at soffit. (All units except commercial unit. 7/11/24: seal all penetrations through vapor barrier, seal all penetrations through top plate, secure electrical wiring 8"from box, nail plates missing throughout. Per previous Notes. STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
07/11/2024 | COT - HCEL - Electrical Intermediate | N/A | Re-inspection required | 7/1/24: M.E.P inspection failed, secure electrical wiring 8" from receptacles, DVW not under test, Domestic water not under test, seal all penetrations through vapor barrier and top plates throughout, nail plates missing throughout, exhaust fans not wired in, grounding at electrical panels must be installed correctly, low voltage boxes not roughed in, properly terminate electrical wiring in boxes (sheathing must extend 1/2" into box), damaged wiring must be replaced, knockouts at panel must be sealed, Condensate drain must be appropriately supported midway in walls, fire blocking required at soffit. (All units except commercial unit. 7/11/24: seal all penetrations through vapor barrier, seal all penetrations through top plate, secure electrical wiring 8"from box, nail plates missing throughout. Per previous Notes. STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
07/11/2024 | COT - HCEL - Electrical Progress | N/A | Re-inspection required | 7/1/24: M.E.P inspection failed, secure electrical wiring 8" from receptacles, DVW not under test, Domestic water not under test, seal all penetrations through vapor barrier and top plates throughout, nail plates missing throughout, exhaust fans not wired in, grounding at electrical panels must be installed correctly, low voltage boxes not roughed in, properly terminate electrical wiring in boxes (sheathing must extend 1/2" into box), damaged wiring must be replaced, knockouts at panel must be sealed, Condensate drain must be appropriately supported midway in walls, fire blocking required at soffit. (All units except commercial unit. 7/11/24: seal all penetrations through vapor barrier, seal all penetrations through top plate, secure electrical wiring 8"from box, nail plates missing throughout. Per previous Notes. STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
07/11/2024 | COT - HCEL - Electrical Above Ceiling | N/A | Re-inspection required | 7/1/24: M.E.P inspection failed, secure electrical wiring 8" from receptacles, DVW not under test, Domestic water not under test, seal all penetrations through vapor barrier and top plates throughout, nail plates missing throughout, exhaust fans not wired in, grounding at electrical panels must be installed correctly, low voltage boxes not roughed in, properly terminate electrical wiring in boxes (sheathing must extend 1/2" into box), damaged wiring must be replaced, knockouts at panel must be sealed, Condensate drain must be appropriately supported midway in walls, fire blocking required at soffit. (All units except commercial unit. 7/11/24: seal all penetrations through vapor barrier, seal all penetrations through top plate, secure electrical wiring 8"from box, nail plates missing throughout. Per previous Notes. STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
08/09/2024 | COT - HCPL - Sewer | N/A | Partial Pass | |
08/15/2024 | COT - HCPL - Yard Water Line | N/A | Partial Pass | Partial pass for main waterline north of building 10 south of building nine running east and west no connection to meter at this time |
07/11/2024 | COT - HCEL - Electrical Underground | N/A | Re-inspection required | 7/1/24: M.E.P inspection failed, secure electrical wiring 8" from receptacles, DVW not under test, Domestic water not under test, seal all penetrations through vapor barrier and top plates throughout, nail plates missing throughout, exhaust fans not wired in, grounding at electrical panels must be installed correctly, low voltage boxes not roughed in, properly terminate electrical wiring in boxes (sheathing must extend 1/2" into box), damaged wiring must be replaced, knockouts at panel must be sealed, Condensate drain must be appropriately supported midway in walls, fire blocking required at soffit. (All units except commercial unit. 7/11/24: seal all penetrations through vapor barrier, seal all penetrations through top plate, secure electrical wiring 8"from box, nail plates missing throughout. Per previous Notes. STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
07/11/2024 | COT - HCEL - Grounding/Bonding | N/A | Re-inspection required | 7/1/24: M.E.P inspection failed, secure electrical wiring 8" from receptacles, DVW not under test, Domestic water not under test, seal all penetrations through vapor barrier and top plates throughout, nail plates missing throughout, exhaust fans not wired in, grounding at electrical panels must be installed correctly, low voltage boxes not roughed in, properly terminate electrical wiring in boxes (sheathing must extend 1/2" into box), damaged wiring must be replaced, knockouts at panel must be sealed, Condensate drain must be appropriately supported midway in walls, fire blocking required at soffit. (All units except commercial unit. 7/11/24: seal all penetrations through vapor barrier, seal all penetrations through top plate, secure electrical wiring 8"from box, nail plates missing throughout. Per previous Notes. STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0423-01033
Permit Description: EXISTING BLDG 10, REHAB, 5517 SF, 5 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/29/2024 | COT - LCPL - Rough Soil | Passed | Underground plumbing for Building #10 is complete and holding a water test in each unit. Okay to shade pipes and backfill trenches for slab pour back. | |
07/01/2024 | COT - LCBU - Preslab | Passed | ||
07/11/2024 | COT - HCPL - Plumbing Intermediate | Passed | 7/1/24: M.E.P inspection failed, secure electrical wiring 8" from receptacles, DVW not under test, Domestic water not under test, seal all penetrations through vapor barrier and top plates throughout, nail plates missing throughout, exhaust fans not wired in, grounding at electrical panels must be installed correctly, low voltage boxes not roughed in, properly terminate electrical wiring in boxes (sheathing must extend 1/2" into box), damaged wiring must be replaced, knockouts at panel must be sealed, Condensate drain must be appropriately supported midway in walls, fire blocking required at soffit. (All units except commercial unit. 7/11/24: corrections made ok to proceed. |
|
07/11/2024 | COT - HCME - Mechanical Intermediate | Passed | 7/1/24: M.E.P inspection failed, secure electrical wiring 8" from receptacles, DVW not under test, Domestic water not under test, seal all penetrations through vapor barrier and top plates throughout, nail plates missing throughout, exhaust fans not wired in, grounding at electrical panels must be installed correctly, low voltage boxes not roughed in, properly terminate electrical wiring in boxes (sheathing must extend 1/2" into box), damaged wiring must be replaced, knockouts at panel must be sealed, Condensate drain must be appropriately supported midway in walls, fire blocking required at soffit. (All units except commercial unit. 7/11/24: corrections made ok to proceed. |
|
07/11/2024 | COT - HCEL - Electrical Intermediate | Passed | 7/1/24: M.E.P inspection failed, secure electrical wiring 8" from receptacles, DVW not under test, Domestic water not under test, seal all penetrations through vapor barrier and top plates throughout, nail plates missing throughout, exhaust fans not wired in, grounding at electrical panels must be installed correctly, low voltage boxes not roughed in, properly terminate electrical wiring in boxes (sheathing must extend 1/2" into box), damaged wiring must be replaced, knockouts at panel must be sealed, Condensate drain must be appropriately supported midway in walls, fire blocking required at soffit. (All units except commercial unit. 7/11/24: corrections made ok to proceed. |
|
07/11/2024 | COT - HCEL - Electrical Progress | Passed | 7/1/24: M.E.P inspection failed, secure electrical wiring 8" from receptacles, DVW not under test, Domestic water not under test, seal all penetrations through vapor barrier and top plates throughout, nail plates missing throughout, exhaust fans not wired in, grounding at electrical panels must be installed correctly, low voltage boxes not roughed in, properly terminate electrical wiring in boxes (sheathing must extend 1/2" into box), damaged wiring must be replaced, knockouts at panel must be sealed, Condensate drain must be appropriately supported midway in walls, fire blocking required at soffit. (All units except commercial unit. 7/11/24: corrections made ok to proceed. |
|
07/11/2024 | COT - HCEL - Electrical Above Ceiling | Passed | 7/1/24: M.E.P inspection failed, secure electrical wiring 8" from receptacles, DVW not under test, Domestic water not under test, seal all penetrations through vapor barrier and top plates throughout, nail plates missing throughout, exhaust fans not wired in, grounding at electrical panels must be installed correctly, low voltage boxes not roughed in, properly terminate electrical wiring in boxes (sheathing must extend 1/2" into box), damaged wiring must be replaced, knockouts at panel must be sealed, Condensate drain must be appropriately supported midway in walls, fire blocking required at soffit. (All units except commercial unit. 7/11/24: corrections made ok to proceed. |
|
11/06/2024 | COT - HCEL - Grounding/Bonding | Passed | ||
11/12/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. Building #10. 10-113,10-112,10-111,10-110,10-109,10-100. 11/12/2024 |