Permit: TC-COM-0423-01028
Permit Details
Apply Date:
04/11/2023
Applicant:
Corky Poster
Description:
EXISTING BLDG 4, REHAB, 482 SF, 1 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Permit Reviews
Permit Number - TC-COM-0423-01028
Permit Status: Issued
Permit Description: EXISTING BLDG 4, REHAB, 482 SF, 1 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/27/2023 | COMMERCIAL REVIEW - FULL v.1 | 05/30/2023 | REQUIRES RESUBMIT |
06/27/2023 | COMMERCIAL REVIEW - FULL v.2 | 07/03/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0423-01028
Permit Status: Issued
Permit Description: EXISTING BLDG 4, REHAB, 482 SF, 1 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Total Outstanding Activity Conditions - 9
Date | Name |
---|---|
12/18/2024 | AIR BALANCING REPORT IS REQUIRED. |
12/18/2024 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
12/18/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
12/18/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
12/18/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
12/18/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
12/18/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
12/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
12/18/2024 | Prior to project being finalized applicant must provide new water easement recordation information |
Conditions
Permit Number - TC-COM-0423-01028
Permit Status: Issued
Permit Description: EXISTING BLDG 4, REHAB, 482 SF, 1 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Date | Description | Comments |
---|---|---|
06/16/2023 | Please contact Pima County Addressing to resolve your addressing issue related to FILL IN THIS SPACE. Addressing@pima.gov or 520-724-9512 | |
12/18/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
12/18/2024 | NESHAP Permit is required. (Utilized with commercial demolition permits) | |
12/18/2024 | Verify that Permit #P23SD00041 - Milagro on Oracle - Public Sewer is issued and all fees are paid – Waste water receipt | |
12/18/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0423-01028
Permite Description: EXISTING BLDG 4, REHAB, 482 SF, 1 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/04/2023 | COT - LCBU - Preslab | N/A | Canceled | Contractor cancelled. |
05/01/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | No gas service on this site. |
12/06/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
12/13/2024 | ENGR Engineering Final | N/A | Partial Pass | Okay for TCO Level 4 |
12/17/2024 | COT - FCON - Alarm - Final | N/A | Partial Pass | Fire Alarm is not complete, need report from State Elevator Inspector. |
12/17/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Fire Alarm is not complete, need report from State Elevator Inspector. OK for TCO level 4. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0423-01028
Permit Description: EXISTING BLDG 4, REHAB, 482 SF, 1 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/21/2024 | COT - LCBU - Preslab | Passed | ||
05/01/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
05/01/2024 | COT - LCEL - Electrical Intermediate | Passed | ||
05/01/2024 | COT - LCEL - Electrical Underground | Passed | ||
05/01/2024 | COT - LCEL - Grounding/Bonding | Passed | ||
10/01/2024 | COT - LCEL - Electrical Progress | Passed | ||
12/06/2024 | COT - LCEL - Electrical Final | Passed | ||
12/06/2024 | COT - LCME - Mechanical Final | Passed | ||
12/12/2024 | COT - LCEL - Outdoor Lighting | Passed | ||
12/12/2024 | COT - LCBU - Building Final | Passed | ||
12/12/2024 | COT - LCPL - Plumbing Final | Passed | ||
12/17/2024 | COT - FCON - Sprinkler - Final | Passed |