Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
04/11/2023
Applicant:
Corky Poster
Description:
EXISTING BLDG 4, REHAB, 482 SF, 1 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.

Permit Reviews

Permit Number - TC-COM-0423-01028
Permit Status: Issued
Permit Description: EXISTING BLDG 4, REHAB, 482 SF, 1 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Start Date Submittal Complete Date Status  
04/27/2023 COMMERCIAL REVIEW - FULL v.1 05/30/2023 REQUIRES RESUBMIT Review Details
06/27/2023 COMMERCIAL REVIEW - FULL v.2 07/03/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0423-01028
Permit Status: Issued
Permit Description: EXISTING BLDG 4, REHAB, 482 SF, 1 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Total Outstanding Activity Conditions - 9
Date Name
12/18/2024 AIR BALANCING REPORT IS REQUIRED.
12/18/2024 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
12/18/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
12/18/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/18/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
12/18/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
12/18/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
12/18/2024 Prior to project being finalized applicant must provide new water easement recordation information

Conditions

Permit Number - TC-COM-0423-01028
Permit Status: Issued
Permit Description: EXISTING BLDG 4, REHAB, 482 SF, 1 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Date Description Comments
06/16/2023 Please contact Pima County Addressing to resolve your addressing issue related to FILL IN THIS SPACE. Addressing@pima.gov or 520-724-9512
12/18/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
12/18/2024 NESHAP Permit is required. (Utilized with commercial demolition permits)
12/18/2024 Verify that Permit #P23SD00041 - Milagro on Oracle - Public Sewer is issued and all fees are paid – Waste water receipt
12/18/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0423-01028
Permite Description: EXISTING BLDG 4, REHAB, 482 SF, 1 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/04/2023 COT - LCBU - Preslab N/A Canceled Contractor cancelled.
05/01/2024 COT - BULD - SWG Clearance N/A Not Applicable No gas service on this site.
12/06/2024 BULD - Electrical Clearance N/A Not Applicable
12/13/2024 ENGR Engineering Final N/A Partial Pass Okay for TCO Level 4
12/17/2024 COT - FCON - Alarm - Final N/A Partial Pass Fire Alarm is not complete, need report from State Elevator Inspector.
12/17/2024 COT - FCON - Fire - Final N/A Partial Pass Fire Alarm is not complete, need report from State Elevator Inspector. OK for TCO level 4.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0423-01028
Permit Description: EXISTING BLDG 4, REHAB, 482 SF, 1 UNIT - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING", BLDGS 1,2,4-8 & 10 "COMMERCIAL ADDITION/ALTERATION PERMIT". "DEMO" INCLUDED IN BLDG 9 PERMIT.
Total Completed Inspections - 12
Date Description Inspector Results Comments
02/21/2024 COT - LCBU - Preslab Passed
05/01/2024 COT - LCEL - Electrical Above Ceiling Passed
05/01/2024 COT - LCEL - Electrical Intermediate Passed
05/01/2024 COT - LCEL - Electrical Underground Passed
05/01/2024 COT - LCEL - Grounding/Bonding Passed
10/01/2024 COT - LCEL - Electrical Progress Passed
12/06/2024 COT - LCEL - Electrical Final Passed
12/06/2024 COT - LCME - Mechanical Final Passed
12/12/2024 COT - LCEL - Outdoor Lighting Passed
12/12/2024 COT - LCBU - Building Final Passed
12/12/2024 COT - LCPL - Plumbing Final Passed
12/17/2024 COT - FCON - Sprinkler - Final Passed

Documents

File Name Document Type  
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW