Permit: TC-COM-0423-00964
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
8701 E BROADWAY BL
Address NEW:
8701 E BROADWAY BL
Apply Date:
04/05/2023
Applicant:
Alexis Alvarez
Description:
New Photvoltaic System 3 Steel Stand Alone Structures - 169 Modules INSTALL (2) SOLAR CARPORTS INSTALL (1) TRANSFORMER INSTALL WALL-MOUNTED PV EQUIPMENT INSTALL (7) CARPORT MOUNTED LIGHTS REV1: The electrical drawings were revised to included Evolve EACL light instead of the ALR2 linear fixture to comply with the 2012 City of Tucson Lighting Code (sheet E11), updated bill of material for make and model of utility required PV meter socket, model of PV sub panel (sheet E20 and E21) and a new AC panel detail sheet SE24.
Permit Reviews
Permit Number - TC-COM-0423-00964
Permit Status: Complete
Permit Description: New Photvoltaic System 3 Steel Stand Alone Structures - 169 Modules
INSTALL (2) SOLAR CARPORTS
INSTALL (1) TRANSFORMER
INSTALL WALL-MOUNTED PV EQUIPMENT
INSTALL (7) CARPORT MOUNTED LIGHTS
REV1: The electrical drawings were revised to included Evolve EACL light instead of the ALR2 linear fixture to comply with the 2012 City of Tucson Lighting Code (sheet E11), updated bill of material for make and model of utility required PV meter socket, model of PV sub panel (sheet E20 and E21) and a new AC panel detail sheet SE24.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/01/2025 | APPROVED |
| 11/24/2023 | COMMERCIAL REVIEW - FULL v.2 | 12/19/2023 | REQUIRES RESUBMIT |
| 06/06/2024 | COMMERCIAL REVIEW - FULL v.1 | 07/08/2024 | APPROVED |
| 04/04/2024 | RESTAMP - COMMERCIAL v.1 | 04/08/2024 | APPROVED |
| 03/05/2024 | COMMERCIAL REVIEW - FULL v.3 | 04/04/2024 | APPROVED |
| 04/13/2023 | COMMERCIAL REVIEW - FULL v.1 | 05/15/2023 | REQUIRES RESUBMIT |
| 02/21/2025 | COMMERCIAL REVIEW - FULL v.1 | 03/07/2025 | APPROVED |
| 02/02/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/03/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0423-00964
Permit Status: Complete
Permit Description: New Photvoltaic System 3 Steel Stand Alone Structures - 169 Modules
INSTALL (2) SOLAR CARPORTS
INSTALL (1) TRANSFORMER
INSTALL WALL-MOUNTED PV EQUIPMENT
INSTALL (7) CARPORT MOUNTED LIGHTS
REV1: The electrical drawings were revised to included Evolve EACL light instead of the ALR2 linear fixture to comply with the 2012 City of Tucson Lighting Code (sheet E11), updated bill of material for make and model of utility required PV meter socket, model of PV sub panel (sheet E20 and E21) and a new AC panel detail sheet SE24.
| Date | Description | Comments |
|---|---|---|
| 04/22/2024 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 04/08/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 04/22/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 07/08/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. | |
| 04/22/2024 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
| 04/22/2024 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. | |
| 04/22/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-00964
Permite Description: New Photvoltaic System 3 Steel Stand Alone Structures - 169 Modules
INSTALL (2) SOLAR CARPORTS
INSTALL (1) TRANSFORMER
INSTALL WALL-MOUNTED PV EQUIPMENT
INSTALL (7) CARPORT MOUNTED LIGHTS
REV1: The electrical drawings were revised to included Evolve EACL light instead of the ALR2 linear fixture to comply with the 2012 City of Tucson Lighting Code (sheet E11), updated bill of material for make and model of utility required PV meter socket, model of PV sub panel (sheet E20 and E21) and a new AC panel detail sheet SE24.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 5/6/25: TEP RECN clearance for 8701 E BROADWAY BL, pending solar, verbal clearance sent at 7:47pm |
| 06/09/2025 | COT - CSOL - Electrical Progress Solar Project | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-00964
Permit Description: New Photvoltaic System 3 Steel Stand Alone Structures - 169 Modules
INSTALL (2) SOLAR CARPORTS
INSTALL (1) TRANSFORMER
INSTALL WALL-MOUNTED PV EQUIPMENT
INSTALL (7) CARPORT MOUNTED LIGHTS
REV1: The electrical drawings were revised to included Evolve EACL light instead of the ALR2 linear fixture to comply with the 2012 City of Tucson Lighting Code (sheet E11), updated bill of material for make and model of utility required PV meter socket, model of PV sub panel (sheet E20 and E21) and a new AC panel detail sheet SE24.
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2025 | COT - LCBU - Preslab | Passed | Approved pier foundation reinforcement and Ufer ground for (2) solar structures, okay for concrete placement pending SI approval | |
| 03/26/2025 | COT - CSOL - Grounding/Bonding Solar Project | Passed | Ufer Ground | |
| 05/09/2025 | COT - LCBU - Building Final | Passed | ||
| 05/09/2025 | COT - CSOL - Electrical Final Solar Project | Passed | Approved solar and structures - DGC Clearance to TEP is required for the solar meter | |
| 05/09/2025 | SITE - Zoning Final | Passed | Placement of equipment is accurate to approved plans with no observed zoning issues. Zoning Final Passed. | |
| 05/09/2025 | COT - LCEL - Electrical Final | Passed | Approved solar and structures - DGC Clearance to TEP is required for the solar meter | |
| 06/09/2025 | COT - CSOL - Electrical Underground Solar Project | Passed | ||
| 06/09/2025 | BULD - Electrical Clearance | Passed | duplicate DGC | |
| 06/09/2025 | ENGR Engineering Final | Passed | Site is clean and clear. Everything is in accordance with stamped plans. | |
| 06/09/2025 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
| 07/02/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | Passed by Tony 3/26/25 |