Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0423-00944
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1130 W MIRACLE MILE BLDG 2
Address NEW:
1130 W MIRACLE MILE BLDG 2
Apply Date:
04/03/2023
Applicant:
Brad Davis
Description:
THIS PROJECT IS A 4,332 SF DEMOLITION AND 3,530 SF REPLACEMENT OF THE EXISTING COMMUNITY CENTER INCLUDING A COMMERCIAL KITCHEN. THIS WILL BE A PHASED PROJECT. PHASE I: CONSTRUCT NEW COMMUNITY CENTER. PHASE II: DEMOLISH EXISTING COMMUNITY CENTER.
Permit Reviews
Permit Number - TC-COM-0423-00944
Permit Status: Complete
Permit Description: THIS PROJECT IS A 4,332 SF DEMOLITION AND 3,530 SF REPLACEMENT OF THE EXISTING COMMUNITY CENTER INCLUDING A COMMERCIAL KITCHEN. THIS WILL BE A PHASED PROJECT.
PHASE I: CONSTRUCT NEW COMMUNITY CENTER.
PHASE II: DEMOLISH EXISTING COMMUNITY CENTER.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/28/2023 | RESTAMP - COMMERCIAL v.1 | 08/01/2023 | APPROVED |
| 05/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/17/2024 | APPROVED |
| 07/27/2023 | COMMERCIAL REVIEW - FULL v.3 | 07/28/2023 | APPROVED |
| 06/05/2023 | COMMERCIAL REVIEW - FULL v.2 | 07/07/2023 | REQUIRES RESUBMIT |
| 10/03/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/04/2024 | APPROVED |
| 11/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/13/2024 | APPROVED |
| 09/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/13/2024 | REQUIRES RESUBMIT |
| 04/06/2023 | COMMERCIAL REVIEW - FULL v.1 | 05/04/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0423-00944
Permit Status: Complete
Permit Description: THIS PROJECT IS A 4,332 SF DEMOLITION AND 3,530 SF REPLACEMENT OF THE EXISTING COMMUNITY CENTER INCLUDING A COMMERCIAL KITCHEN. THIS WILL BE A PHASED PROJECT.
PHASE I: CONSTRUCT NEW COMMUNITY CENTER.
PHASE II: DEMOLISH EXISTING COMMUNITY CENTER.
| Date | Description | Comments |
|---|---|---|
| 04/06/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 11/13/2024 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor. | |
| 06/12/2023 | Masonry Inspection Report submittal review is required. | |
| 11/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-00944
Permite Description: THIS PROJECT IS A 4,332 SF DEMOLITION AND 3,530 SF REPLACEMENT OF THE EXISTING COMMUNITY CENTER INCLUDING A COMMERCIAL KITCHEN. THIS WILL BE A PHASED PROJECT.
PHASE I: CONSTRUCT NEW COMMUNITY CENTER.
PHASE II: DEMOLISH EXISTING COMMUNITY CENTER.
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2024 | COT - HCME - Mechanical Above Ceiling | N/A | Canceled | Canceled per contractor. 1/9/2024 |
| 01/09/2024 | COT - HCME - Mechanical Progress | N/A | Canceled | Canceled per contractor. 1/9/2024 |
| 05/07/2024 | COT - HCEL - Electrical Final | N/A | Partial Pass | |
| 05/07/2024 | COT - HCME - Mechanical Final | N/A | Partial Pass | |
| 09/13/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 09/13/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 05/17/2024 | COT - HCBU - Building Final | N/A | Partial Pass | 5/17/24: partial pass level 4 TCO |
| 10/07/2024 | ENGR Engineering Final | N/A | Partial Pass | Contractor needs to replace two dead trees and put the metal piece for the sidewalk scupper they cut it too short in the back |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-00944
Permit Description: THIS PROJECT IS A 4,332 SF DEMOLITION AND 3,530 SF REPLACEMENT OF THE EXISTING COMMUNITY CENTER INCLUDING A COMMERCIAL KITCHEN. THIS WILL BE A PHASED PROJECT.
PHASE I: CONSTRUCT NEW COMMUNITY CENTER.
PHASE II: DEMOLISH EXISTING COMMUNITY CENTER.
Total Completed Inspections - 28
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2023 | COT - HCBU - Preslab | Passed | Rebar reinforcement is in place for footings and columns, subsoil is properly compacted, and u/g sewer pipes are properly wrapped to protect from concrete. Okay to pour concrete for footings and slab on grade. | |
| 11/20/2023 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Rebar reinforcement is in place for footings and columns, subsoil is properly compacted, and u/g sewer pipes are properly wrapped to protect from concrete. Okay to pour concrete for footings and slab on grade. | |
| 12/12/2023 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 12/15/2023 | COT - HCBU - Roof Nailing | Passed | Completed roof nailing inspections with crickets in place. 12/15/2023 | |
| 01/09/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 01/09/2024 | COT - HCEL - Electrical Progress | Passed | ||
| 01/09/2024 | COT - HCBU - Framing | Passed | ||
| 01/09/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 01/09/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 01/09/2024 | COT - HCPL - Gas Pressure Test | Passed | ||
| 02/21/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
| 04/30/2024 | COT - HCPL - Plumbing Progress | Passed | Domestic water tie into building. 4/30/2024 | |
| 05/03/2024 | COT - HCBU - Building Progress | Passed | ||
| 05/07/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 05/07/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 05/07/2024 | COT - HCME - Mechanical Progress | Passed | ||
| 05/07/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
| 05/14/2024 | COT - HCPL - Backwater Valve | Passed | Okay to backfill. Shading required. 5/14/2024 | |
| 09/10/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
| 09/09/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 09/10/2024 | COT - HCEL - Electrical Final | Passed | ||
| 09/10/2024 | COT - HCEL - Electrical Underground | Passed | ||
| 09/10/2024 | COT - HCME - Mechanical Final | Passed | ||
| 09/10/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 09/13/2024 | COT - FCON - Fire - Final | Passed | ||
| 10/07/2024 | COT - HCBU - Building Final | Passed | ||
| 10/07/2024 | COT - HCBU - CofO | Passed | ||
| 10/30/2024 | ENGR Engineering Final | Passed |