Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
04/03/2023
Applicant:
Brad Davis
Description:
THIS PROJECT IS A 4,332 SF DEMOLITION AND 3,530 SF REPLACEMENT OF THE EXISTING COMMUNITY CENTER INCLUDING A COMMERCIAL KITCHEN. THIS WILL BE A PHASED PROJECT. PHASE I: CONSTRUCT NEW COMMUNITY CENTER. PHASE II: DEMOLISH EXISTING COMMUNITY CENTER.

Permit Reviews

Permit Number - TC-COM-0423-00944
Permit Status: Complete
Permit Description: THIS PROJECT IS A 4,332 SF DEMOLITION AND 3,530 SF REPLACEMENT OF THE EXISTING COMMUNITY CENTER INCLUDING A COMMERCIAL KITCHEN. THIS WILL BE A PHASED PROJECT. PHASE I: CONSTRUCT NEW COMMUNITY CENTER. PHASE II: DEMOLISH EXISTING COMMUNITY CENTER.
Start Date Submittal Complete Date Status  
07/28/2023 RESTAMP - COMMERCIAL v.1 08/01/2023 APPROVED Review Details
05/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/17/2024 APPROVED Review Details
07/27/2023 COMMERCIAL REVIEW - FULL v.3 07/28/2023 APPROVED Review Details
06/05/2023 COMMERCIAL REVIEW - FULL v.2 07/07/2023 REQUIRES RESUBMIT Review Details
10/03/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/04/2024 APPROVED Review Details
11/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/13/2024 APPROVED Review Details
09/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/13/2024 REQUIRES RESUBMIT Review Details
04/06/2023 COMMERCIAL REVIEW - FULL v.1 05/04/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0423-00944
Permit Status: Complete
Permit Description: THIS PROJECT IS A 4,332 SF DEMOLITION AND 3,530 SF REPLACEMENT OF THE EXISTING COMMUNITY CENTER INCLUDING A COMMERCIAL KITCHEN. THIS WILL BE A PHASED PROJECT. PHASE I: CONSTRUCT NEW COMMUNITY CENTER. PHASE II: DEMOLISH EXISTING COMMUNITY CENTER.
Date Description Comments
04/06/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
11/13/2024 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor.
06/12/2023 Masonry Inspection Report submittal review is required.
11/06/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0423-00944
Permite Description: THIS PROJECT IS A 4,332 SF DEMOLITION AND 3,530 SF REPLACEMENT OF THE EXISTING COMMUNITY CENTER INCLUDING A COMMERCIAL KITCHEN. THIS WILL BE A PHASED PROJECT. PHASE I: CONSTRUCT NEW COMMUNITY CENTER. PHASE II: DEMOLISH EXISTING COMMUNITY CENTER.
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
01/09/2024 COT - HCME - Mechanical Above Ceiling N/A Canceled Canceled per contractor. 1/9/2024
01/09/2024 COT - HCME - Mechanical Progress N/A Canceled Canceled per contractor. 1/9/2024
05/07/2024 COT - HCEL - Electrical Final N/A Partial Pass
05/07/2024 COT - HCME - Mechanical Final N/A Partial Pass
09/13/2024 BULD - Electrical Clearance N/A Not Applicable
09/13/2024 COT - BULD - SWG Clearance N/A Not Applicable
05/17/2024 COT - HCBU - Building Final N/A Partial Pass 5/17/24: partial pass level 4 TCO
10/07/2024 ENGR Engineering Final N/A Partial Pass Contractor needs to replace two dead trees and put the metal piece for the sidewalk scupper they cut it too short in the back

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0423-00944
Permit Description: THIS PROJECT IS A 4,332 SF DEMOLITION AND 3,530 SF REPLACEMENT OF THE EXISTING COMMUNITY CENTER INCLUDING A COMMERCIAL KITCHEN. THIS WILL BE A PHASED PROJECT. PHASE I: CONSTRUCT NEW COMMUNITY CENTER. PHASE II: DEMOLISH EXISTING COMMUNITY CENTER.
Total Completed Inspections - 28
Date Description Inspector Results Comments
11/20/2023 COT - HCBU - Preslab Passed Rebar reinforcement is in place for footings and columns, subsoil is properly compacted, and u/g sewer pipes are properly wrapped to protect from concrete. Okay to pour concrete for footings and slab on grade.
11/20/2023 COT - HCBU - Excavation/Rebar/Zoning Passed Rebar reinforcement is in place for footings and columns, subsoil is properly compacted, and u/g sewer pipes are properly wrapped to protect from concrete. Okay to pour concrete for footings and slab on grade.
12/12/2023 COT - HCBU - Exterior Clips/Sheathing Passed
12/15/2023 COT - HCBU - Roof Nailing Passed Completed roof nailing inspections with crickets in place. 12/15/2023
01/09/2024 COT - HCEL - Electrical Intermediate Passed
01/09/2024 COT - HCEL - Electrical Progress Passed
01/09/2024 COT - HCBU - Framing Passed
01/09/2024 COT - HCPL - Plumbing Above Ceiling Passed
01/09/2024 COT - HCPL - Plumbing Intermediate Passed
01/09/2024 COT - HCPL - Gas Pressure Test Passed
02/21/2024 COT - HCBU - Building Above Ceiling Passed
04/30/2024 COT - HCPL - Plumbing Progress Passed Domestic water tie into building. 4/30/2024
05/03/2024 COT - HCBU - Building Progress Passed
05/07/2024 COT - HCEL - Electrical Above Ceiling Passed
05/07/2024 COT - HCME - Mechanical Above Ceiling Passed
05/07/2024 COT - HCME - Mechanical Progress Passed
05/07/2024 COT - HCME - Mechanical Intermediate Passed
05/14/2024 COT - HCPL - Backwater Valve Passed Okay to backfill. Shading required. 5/14/2024
09/10/2024 COT - HCEL - Outdoor Lighting Passed
09/09/2024 TRSP - ROW - Final/Close-Out Passed
09/10/2024 COT - HCEL - Electrical Final Passed
09/10/2024 COT - HCEL - Electrical Underground Passed
09/10/2024 COT - HCME - Mechanical Final Passed
09/10/2024 COT - HCPL - Plumbing Final Passed
09/13/2024 COT - FCON - Fire - Final Passed
10/07/2024 COT - HCBU - Building Final Passed
10/07/2024 COT - HCBU - CofO Passed
10/30/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
MILAGRO - CHLORINATION REPORT-2024-05-16_V1.PDF DOCUMENTS VIEW
MILAGRO - TEST AND BALANCE REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-3_DRAWINGS 1130 W MIRACLE MILE 7.24.23_V3.PDF DOCUMENTS VIEW
MILAGRO APTS. SPL. INSP. CERT. INITIAL 7.24.23-2023-07-24_V1.PDF DOCUMENTS VIEW
1130 W MIRACLE MILE PROPERTY CARD.PDF DOCUMENTS VIEW
1130 W MIRACLE MILE RD HISTORIC DEMO 5.22.23_V1.PDF DOCUMENTS VIEW