Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - TC-COM-0423-00944

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
05/09/2024 ENGR Engineering Final Not Ready I have inspected the site to see how much of the sidewalk that has been completed that is still needed. The sidewalk around the building has been completed being poured today and the contractor is working on finishing up all the surfaces to have them ready for tomorrow. There are two locations one on the east side of the building and one on the north side of the building that the roof drainage is depositing Rainwater behind the sidewalks against the building. These two locations will have to be fixed so that the water that is being deposited passes underneath the sidewalk rather than onto or adjacent to. I have met with Alex Munoz and discuss these issues and he will get them repaired as soon as possible. I will not be holding up a TCO Level 4 for full Occupancy tomorrow for this work.
05/10/2024 ENGR Engineering Final Partial Pass OK for TCO level four for the site
09/13/2024 ENGR Engineering Final Partial Pass The contractor still has one more down gutter to repair or replace that should be done this next week prior to a final approved
10/07/2024 ENGR Engineering Final Partial Pass Contractor needs to replace two dead trees and put the metal piece for the sidewalk scupper they cut it too short in the back
10/30/2024 ENGR Engineering Final Passed