Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
3160 E TRANSCON WY
Apply Date:
03/08/2026
Applicant:
scott addis
Description:
New Installation for 75kva stepdown transformer New Installation of 200amp 480/277 volt breaker panel New Installation of 2 200amp 208/120 volt breaker panels

Permit Reviews

Permit Number - TC-COM-0326-00336
Permit Status: Complete
Permit Description: New Installation for 75kva stepdown transformer New Installation of 200amp 480/277 volt breaker panel New Installation of 2 200amp 208/120 volt breaker panels
Start Date Submittal Complete Date Status  
03/31/2026 COMMERCIAL REVIEW - LIMITED v.3 04/01/2026 APPROVED Review Details
03/18/2026 COMMERCIAL REVIEW - LIMITED v.2 03/24/2026 REQUIRES RESUBMIT Review Details
03/12/2026 COMMERCIAL REVIEW - LIMITED v.1 03/12/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0326-00336
Permit Status: Complete
Permit Description: New Installation for 75kva stepdown transformer New Installation of 200amp 480/277 volt breaker panel New Installation of 2 200amp 208/120 volt breaker panels
Date Description Comments
03/12/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/12/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0326-00336
Permit Description: New Installation for 75kva stepdown transformer New Installation of 200amp 480/277 volt breaker panel New Installation of 2 200amp 208/120 volt breaker panels
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/09/2026 COT - LCEL - Electrical Final Passed 4/9/26: APPROVED BY JIM B
04/09/2026 COT - LCEL - Electrical Above Ceiling Passed 4/9/26: APPROVED BY JIM B
04/09/2026 COT - LCEL - Electrical Intermediate Passed 4/9/26: APPROVED BY JIM B

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-CONS-XCIMER PLAN SUBMIT V2_V3.PDF DOCUMENTS VIEW