Permit: TC-COM-0326-00336
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
3160 E TRANSCON WY
Address NEW:
3160 E TRANSCON WY
Apply Date:
03/08/2026
Applicant:
scott addis
Description:
New Installation for 75kva stepdown transformer New Installation of 200amp 480/277 volt breaker panel New Installation of 2 200amp 208/120 volt breaker panels
Permit Reviews
Permit Number - TC-COM-0326-00336
Permit Status: Complete
Permit Description: New Installation for 75kva stepdown transformer
New Installation of 200amp 480/277 volt breaker panel
New Installation of 2 200amp 208/120
volt breaker panels
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/31/2026 | COMMERCIAL REVIEW - LIMITED v.3 | 04/01/2026 | APPROVED |
| 03/18/2026 | COMMERCIAL REVIEW - LIMITED v.2 | 03/24/2026 | REQUIRES RESUBMIT |
| 03/12/2026 | COMMERCIAL REVIEW - LIMITED v.1 | 03/12/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0326-00336
Permit Status: Complete
Permit Description: New Installation for 75kva stepdown transformer
New Installation of 200amp 480/277 volt breaker panel
New Installation of 2 200amp 208/120
volt breaker panels
| Date | Description | Comments |
|---|---|---|
| 03/12/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/12/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0326-00336
Permit Description: New Installation for 75kva stepdown transformer
New Installation of 200amp 480/277 volt breaker panel
New Installation of 2 200amp 208/120
volt breaker panels
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2026 | COT - LCEL - Electrical Final | Passed | 4/9/26: APPROVED BY JIM B | |
| 04/09/2026 | COT - LCEL - Electrical Above Ceiling | Passed | 4/9/26: APPROVED BY JIM B | |
| 04/09/2026 | COT - LCEL - Electrical Intermediate | Passed | 4/9/26: APPROVED BY JIM B |