Permit: TC-COM-0326-00302
Permit Details
Apply Date:
03/02/2026
Applicant:
bill mackey
Description:
Remodel existing office/warehouse space REV1: The following changes are reflected in the drawing set: 1. Dimensional changes on Sheet A2.1. 2. Mop Sink change with drain size, Sheets P1.1 and P1.2. 3. Electrical scope clarified in lighting and power plans, Sheets E0.1, E2.0, E3.0.
Permit Reviews
Permit Number - TC-COM-0326-00302
Permit Status: In revision
Permit Description: Remodel existing office/warehouse space
REV1: The following changes are reflected in the drawing set:
1. Dimensional changes on Sheet A2.1.
2. Mop Sink change with drain size, Sheets P1.1 and P1.2.
3. Electrical scope clarified in lighting and power plans, Sheets E0.1, E2.0, E3.0.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/23/2026 | ADMINISTRATIVE v.2 | 04/24/2026 | APPROVED |
| 03/25/2026 | ADMINISTRATIVE v.1 | 03/25/2026 | REQUIRES RESUBMIT |
| 04/23/2026 | SPECIAL INSPECTION REVIEW v.1 | 04/27/2026 | APPROVED |
| 06/08/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | N/A | IN REVIEW |
| 03/04/2026 | COMMERCIAL REVIEW - FULL v.1 | 03/25/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0326-00302
Permit Status: In revision
Permit Description: Remodel existing office/warehouse space
REV1: The following changes are reflected in the drawing set:
1. Dimensional changes on Sheet A2.1.
2. Mop Sink change with drain size, Sheets P1.1 and P1.2.
3. Electrical scope clarified in lighting and power plans, Sheets E0.1, E2.0, E3.0.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/24/2026 | AIR BALANCING REPORT IS REQUIRED. |
| 03/24/2026 | SPECIAL INSPECTION OF POST-INSTALLED ANCHORS IS REQUIRED. |
| 03/24/2026 | SPECIAL INSPECTION OF WELDING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0326-00302
Permit Status: In revision
Permit Description: Remodel existing office/warehouse space
REV1: The following changes are reflected in the drawing set:
1. Dimensional changes on Sheet A2.1.
2. Mop Sink change with drain size, Sheets P1.1 and P1.2.
3. Electrical scope clarified in lighting and power plans, Sheets E0.1, E2.0, E3.0.
| Date | Description | Comments |
|---|---|---|
| 03/04/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/04/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/24/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |