Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0325-00424
Permit Details
Apply Date:
03/04/2025
Applicant:
Angel Rascon
Description:
Electrical upgrade for 125-amp triplex, one- and two-pack meter, each is all in one panel.
Permit Reviews
Permit Number - TC-COM-0325-00424
Permit Status: Inspections
Permit Description: Electrical upgrade for 125-amp triplex, one- and two-pack meter, each is all in one panel.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/19/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 03/19/2025 | REQUIRES RESUBMIT |
| 03/07/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 03/10/2025 | REQUIRES RESUBMIT |
| 04/14/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.3 | 04/14/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0325-00424
Permit Status: Inspections
Permit Description: Electrical upgrade for 125-amp triplex, one- and two-pack meter, each is all in one panel.
| Date | Description | Comments |
|---|---|---|
| 03/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0325-00424
Permit Description: Electrical upgrade for 125-amp triplex, one- and two-pack meter, each is all in one panel.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2025 | BULD - Electrical Clearance | Passed | Approved 125A service panel upgrade for (3) panels - INCR Clearance to TEP is required for the cutover at 725 S 5th Av , 727 S 5th Av , and 729 S 5th Av |