Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2025 | BULD - Electrical Clearance | Passed | Approved 125A service panel upgrade for (3) panels - INCR Clearance to TEP is required for the cutover at 725 S 5th Av , 727 S 5th Av , and 729 S 5th Av |