Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/02/2025
Applicant:
Joseph Maher
Description:
Condo 149: A minor interior repair and remodel of an existing condo located within a condo development of individual 2-story buildings of 2-condos each. Joseph Maher architect

Permit Reviews

Permit Number - TC-COM-0325-00408
Permit Status: Complete
Permit Description: Condo 149: A minor interior repair and remodel of an existing condo located within a condo development of individual 2-story buildings of 2-condos each. Joseph Maher architect
Start Date Submittal Complete Date Status  
04/04/2025 COMMERCIAL REVIEW - FULL v.1 04/24/2025 APPROVED Review Details
03/03/2025 COMMERCIAL REVIEW - FULL v.1 03/11/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0325-00408
Permit Status: Complete
Permit Description: Condo 149: A minor interior repair and remodel of an existing condo located within a condo development of individual 2-story buildings of 2-condos each. Joseph Maher architect
Date Description Comments
03/03/2025 Please confirm Unit number.
04/24/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
04/05/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0325-00408
Permit Description: Condo 149: A minor interior repair and remodel of an existing condo located within a condo development of individual 2-story buildings of 2-condos each. Joseph Maher architect
Total Completed Inspections - 8
Date Description Inspector Results Comments
11/13/2025 COT - HCBU - Preslab Passed Passed 11/13/25
11/13/2025 COT - HCBU - Excavation/Rebar/Zoning Passed Passed 11/13/25
11/13/2025 COT - HCBU - Building Above Ceiling Passed Passed 11/13/25
11/14/2025 COT - HCBU - Framing Passed
12/02/2025 COT - FCON - Fire - Final Passed
12/02/2025 ENGR Engineering Final Passed
12/02/2025 TRSP - ROW - Final/Close-Out Passed
12/02/2025 COT - HCBU - Building Final Passed 12.2.25
Approved