Permit: TC-COM-0324-00425
Permit Details
Apply Date:
03/07/2024
Applicant:
Vince Catalano
Description:
Remodel of existing container units building 14. Not in your system.
Permit Reviews
Permit Number - TC-COM-0324-00425
Permit Status: Inspections
Permit Description: Remodel of existing container units
building 14. Not in your system.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/14/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 04/02/2024 | REQUIRES RESUBMIT |
04/10/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 04/29/2024 | APPROVED |
05/31/2024 | RESTAMP - COMMERCIAL v.1 | 06/04/2024 | APPROVED |
04/29/2024 | RESTAMP - COMMERCIAL v.1 | 04/30/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0324-00425
Permit Status: Inspections
Permit Description: Remodel of existing container units
building 14. Not in your system.
Total Outstanding Activity Conditions - 10
Date | Name |
---|---|
04/01/2024 | AIR BALANCING REPORT IS REQUIRED. |
04/01/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
04/01/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
04/01/2024 | Post Installed Anchor Shop Drawings including current ESR Report must be submitted and approved prior to Final Inspection |
04/01/2024 | Reinforcing Shop Drawings must be submitted and approved prior to Final Inspection |
04/01/2024 | Structural Steel Shop to include Drawings and Product Data Designs must be submitted and approved prior to Final inspection. |
04/01/2024 | Post-Installed Anchor Inspection Report is required. |
04/01/2024 | SPECIAL INSPECTION FOR SOILS IS REQUIRED |
04/01/2024 | SPECIAL INSPECTION FOR STEEL CONSTRUCTION IS REQUIRED |
04/01/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0324-00425
Permit Status: Inspections
Permit Description: Remodel of existing container units
building 14. Not in your system.
Date | Description | Comments |
---|---|---|
03/14/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
03/14/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
04/30/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
04/24/2024 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor. | |
04/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0324-00425
Permite Description: Remodel of existing container units
building 14. Not in your system.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/12/2024 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 11/12/24: reinforcement at 11 footings per plan ok to proceed with concrete placement. |
11/12/2024 | COT - LCPL - Rough Soil | N/A | Partial Pass | 11/12/24: reinforcement at 11 footings per plan ok to proceed with concrete placement. |