Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - LIMITED v.1

Permit Number - TC-COM-0324-00425
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/26/2024 Commercial Electrical APPROVED
03/28/2024 Site Zoning APPROVED
03/18/2024 Site Engineering NOT REQUIRED
04/02/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
04/02/2024 Commercial Building REQUIRES RESUBMIT Please submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed.

Sheet A1: Please amend and update the edition of the governing codes under General Notes to reflect the 2018 edition of the I-codes and the 2017 edition of the NEC. IBC 107.2.1 Additionally please include the 2018 IEBC.

Sheet A1: Please amend plans to include a detailed description of the work involved in this permit’s scope. IBC 105.3 Based on available permitting history, these containers were Storage units #7&8.

Sheet A1: Please provide the Soils Report #63155017 by Terracon Dated May 19, 2015, with the next submittal. IBC 107.2.1

Sheet A2: Please amend plans to indicate the following: IBC 107.2.1

Door size for new opening in larger container.

Show door landing for above door.

Indicate tempered glazing in window next to above door.

Indicate the SHGC and the U-Factor for the new windows installed in the larger container.

Sheet A2: Sheet A4: Please amend plans so all documents show the same information. Sheet A4 indicates a Type II hood and Sheet M2 depicts a Type I hood. Please resolve. IBC 107.2.1



Mark Masek

Plans Examiner

Mark.masek@tucsonaz.gov

520-837-4994
04/02/2024 Commercial Mechanical REQUIRES RESUBMIT 1. Specify the type of venting system and the venting materials to be used for the proposed water heater. Reference: Section 503.1, IFGC 2018.
2. The Type II hood has 800 CFM of exhaust while the make-up air unit, MUA-1 provides 640 CFM. Show how adequate make-up air is to be provided to the room so that the room pressure remains essentially neutral. Reference: Section 501.4, IMC 2018.
3. Provide locking access port caps for the condensing unit per Section 1101.10, IMC 2018 or locate the condensing unit in a controlled
04/02/2024 Commercial Plumbing REQUIRES RESUBMIT Correct the description of equipment tag #16 as shown in the Low Pressure Propane Load chart. It is a gas-fired, double convection oven, not a “burner stove.”
04/02/2024 Water - PDSD REQUIRES RESUBMIT Show the location and size of the existing water meter, backflow preventer, and the water service pipe on a site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018.
03/25/2024 Fire New Construction REVIEW COMPLETED
03/14/2024 PDSD Application Completeness Express REVIEW COMPLETED