Permit: TC-COM-0323-00874
Permit Details
Apply Date:
03/23/2023
Applicant:
Doni Nicoll-Duir
Description:
Install 21.84 kW DC Solar Electric System on New Steel Carport.
Permit Reviews
Permit Number - TC-COM-0323-00874
Permit Status: Issued
Permit Description: Install 21.84 kW DC Solar Electric System on New Steel Carport.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/28/2023 | COMMERCIAL REVIEW - FULL v.3 | 09/28/2023 | REQUIRES RESUBMIT |
09/28/2023 | COMMERCIAL REVIEW - FULL v.4 | 10/23/2023 | REQUIRES RESUBMIT |
03/28/2023 | COMMERCIAL REVIEW - FULL v.1 | 03/28/2023 | REQUIRES RESUBMIT |
03/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/14/2024 | APPROVED |
11/07/2023 | RESTAMP - COMMERCIAL v.1 | 11/09/2023 | APPROVED |
06/22/2023 | COMMERCIAL REVIEW - FULL v.2 | 07/24/2023 | REQUIRES RESUBMIT |
10/24/2023 | COMMERCIAL REVIEW - FULL v.5 | 11/07/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0323-00874
Permit Status: Issued
Permit Description: Install 21.84 kW DC Solar Electric System on New Steel Carport.
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
07/21/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
07/21/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
09/13/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
09/13/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0323-00874
Permit Status: Issued
Permit Description: Install 21.84 kW DC Solar Electric System on New Steel Carport.
Date | Description | Comments |
---|---|---|
07/21/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
07/21/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
11/09/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
07/21/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
07/21/2023 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
07/21/2023 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0323-00874
Permite Description: Install 21.84 kW DC Solar Electric System on New Steel Carport.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/20/2024 | COT - CSOL - Electrical Intermediate Solar Project | N/A | Not Applicable |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0323-00874
Permit Description: Install 21.84 kW DC Solar Electric System on New Steel Carport.
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/05/2024 | COT - CSOL - Electrical Underground Solar Project | Passed | Approved underground electrical conduits from equipment location to solar canopy location, okay to backfill progress areas | |
03/20/2024 | COT - LCBU - Building Final | Passed | ||
03/20/2024 | ENGR Engineering Final | Passed | ||
03/20/2024 | COT - CSOL - Electrical Final Solar Project | Passed | ||
03/20/2024 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
03/20/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |