Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/26/2024 | BULD - Electrical Clearance | Partial Pass | Partial Pass - grounding installed for line side tap, for future solar installation. Clearance called into TEP at 11:25 for DGL, for reconnect of buildings main power, after power kill. |
|
| 03/20/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |