Permit: TC-COM-0323-00791
Permit Details
Apply Date:
03/10/2023
Applicant:
garrett Murphy
Description:
568.62kW DC Photovoltaic Solar Shade Canopies
Permit Reviews
Permit Number - TC-COM-0323-00791
Permit Status: Complete
Permit Description: 568.62kW DC Photovoltaic Solar Shade Canopies
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/14/2023 | COMMERCIAL REVIEW - FULL v.1 | 04/23/2023 | REQUIRES RESUBMIT |
10/18/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/26/2023 | APPROVED |
06/21/2023 | COMMERCIAL REVIEW - FULL v.2 | 06/21/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0323-00791
Permit Status: Complete
Permit Description: 568.62kW DC Photovoltaic Solar Shade Canopies
Date | Description | Comments |
---|---|---|
04/22/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
04/22/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
04/22/2023 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
10/25/2023 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. | |
04/22/2023 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00791
Permite Description: 568.62kW DC Photovoltaic Solar Shade Canopies
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/12/2023 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the line-side cabinet, DGL Clearance was called into TEP at 1:45pm (3 day Powerkill) Pending solar |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00791
Permit Description: 568.62kW DC Photovoltaic Solar Shade Canopies
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/17/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 8/17/23_ pass for canopy C , 7 columns at 16' deep, okay to pour concrete for canopy C | |
08/17/2023 | COT - LCEL - Grounding/Bonding | Passed | 8/17/23: pass for 7 columns at canopy C 16' deep steel column in lieu of ufer | |
08/30/2023 | COT - LCEL - Electrical Underground | Passed | okay to cover underground electric for canopy’s A,B and C | |
09/20/2023 | COT - LCBU - Framing | Passed | Approved structures A,B,C per special inspection | |
09/20/2023 | COT - LCBU - Building Progress | Passed | ||
09/26/2023 | COT - LCEL - Outdoor Lighting | Passed | Approved lighting under canopy | |
10/11/2023 | COT - CSOL - Electrical Underground Solar Project | Passed | ||
10/20/2023 | ENGR Engineering Final | Passed | ||
10/24/2023 | COT - LCBU - Building Final | Passed | ||
10/24/2023 | BULD - Electrical Clearance | Passed | Approved, DGC/DGL Clearance to TEP is required for the solar meter (3 PV structures) | |
10/24/2023 | COT - LCEL - Electrical Final | Passed | ||
10/24/2023 | COT - LCEL - Electrical Intermediate | Passed | ||
10/24/2023 | COT - LCEL - Electrical Progress | Passed | ||
11/24/2023 | TRSP - ROW - Final/Close-Out | Passed |