Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2023 | BULD - Electrical Clearance | Partial Pass | Partial for the line-side cabinet, DGL Clearance was called into TEP at 1:45pm (3 day Powerkill) Pending solar |
|
| 10/24/2023 | BULD - Electrical Clearance | Passed | Approved, DGC/DGL Clearance to TEP is required for the solar meter (3 PV structures) |