Permit: TC-COM-0323-00764
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2880 N EL BURRITO AV
Address NEW:
2880 N EL BURRITO AV
Apply Date:
03/07/2023
Applicant:
Bryan Hill
Description:
Interior remodel adding kitchen and production area and warehouse remodel
Permit Reviews
Permit Number - TC-COM-0323-00764
Permit Status: Complete
Permit Description: Interior remodel adding kitchen and production area and warehouse remodel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/14/2023 | COMMERCIAL REVIEW - FULL v.1 | 03/14/2023 | REQUIRES RESUBMIT |
| 04/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/04/2024 | APPROVED |
| 06/22/2023 | COMMERCIAL REVIEW - FULL v.3 | 07/24/2023 | APPROVED |
| 03/15/2023 | COMMERCIAL REVIEW - FULL v.2 | 06/20/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0323-00764
Permit Status: Complete
Permit Description: Interior remodel adding kitchen and production area and warehouse remodel
| Date | Description | Comments |
|---|---|---|
| 04/02/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 07/26/2023 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 06/20/2023 | Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection. | |
| 04/02/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00764
Permite Description: Interior remodel adding kitchen and production area and warehouse remodel
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2023 | COT - HCPL - Plumbing Intermediate | N/A | Canceled | Canceled per contractor. 9/22/2023 |
| 01/09/2024 | COT - HCBU - Framing | N/A | Re-inspection required | Not ready. Pending rfi for securing furred out walls to masonry walls. Add backing for Ada restroom and fire blocking at 8'. Secure bottom plate to concrete and wood floor second floor. 1/9/2024 |
| 03/12/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 09/22/2023 | COT - HCBU - Preslab | N/A | Partial Pass | 9/22/2023 pre slab north half of building okay for concrete placement. |
| 03/12/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00764
Permit Description: Interior remodel adding kitchen and production area and warehouse remodel
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2023 | COT - HCPL - Rough Soil | Passed | Looked at rough soil for fixtures. DWV filled under pressure. Grease trap interceptor is put in place also under pressure. Okay to backfill. Shading required. 8/9/2023 | |
| 01/17/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 01/17/2024 | COT - HCBU - Framing | Passed | Approved. Corrections were made. 1/17/2024 | |
| 01/17/2024 | COT - HCPL - Yard Water Line | Passed | Okay to backfill. Shading required. 1/17/2023 | |
| 02/16/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 03/12/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
| 03/12/2024 | COT - HCBU - Preslab | Passed | ||
| 03/12/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 03/12/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 03/12/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 03/12/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
| 03/13/2024 | ENGR Engineering Final | Passed | ||
| 03/13/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 03/26/2024 | COT - FCON - Fire - Final | Passed | ||
| 04/03/2024 | COT - HCPL - Plumbing Final | Passed | Corrections were made. Air and balance report and chlorination report uploaded and are under review in the portal. 4/3/2024 | |
| 04/03/2024 | COT - HCME - Mechanical Final | Passed | Corrections were made. Air and balance report uploaded and are under review in the portal. 4/3/2024 | |
| 04/03/2024 | COT - HCEL - Electrical Final | Passed | ||
| 04/03/2024 | COT - HCBU - Building Final | Passed | Corrections were made. Air and balance report and chlorination report uploaded and are under review in the portal. 4/3/2024 |