Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Commercial Building
Address NEW:
6910 E TANQUE VERDE RD
Apply Date:
02/24/2026
Applicant:
Saanya Papar
Description:
Construction of a new 1 story Autozone (auto-parts) retail store.

Permit Reviews

Permit Number - TC-COM-0226-00263
Permit Status: Needs resubmittal
Permit Description: Construction of a new 1 story Autozone (auto-parts) retail store.
Start Date Submittal Complete Date Status  
02/27/2026 COMMERCIAL REVIEW - FULL v.1 03/24/2026 REQUIRES RESUBMIT Review Details
04/14/2026 COMMERCIAL REVIEW - FULL v.2 05/07/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0226-00263
Permit Status: Needs resubmittal
Permit Description: Construction of a new 1 story Autozone (auto-parts) retail store.
Total Outstanding Activity Conditions - 12
Date Name
02/27/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/27/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/22/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/22/2026 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/22/2026 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
03/22/2026 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/22/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
03/22/2026 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
03/22/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
03/22/2026 SPECIAL INSPECTION FOR WELDING IS REQUIRED.
03/23/2026 AIR BALANCING REPORT IS REQUIRED.
03/23/2026 WATER STERILIZATION REPORT IS REQUIRED.