Permit Details

Status:
In Review
Type:
Commercial Building
Address:
130 S SCOTT AV
Address NEW:
130 S SCOTT AV
Apply Date:
02/04/2026
Applicant:
Joe Alitiem
Description:
Install a parking structure solar array. SCOPE OF WORK SYSTEM SIZE : STC : 84 X 545W= 45.78 KW DC PTC : 84 X 502.2W = 42.18 KW DC AC SIZE: 60.0 KW AC 84) LONGI SOLAR LR5-72HBD-545M (545W) MODULES (01) SOLIS S5-GC60K-LV-US (208V) INVERTER. Install a new 75KVA TRANSFORMER PRIMARY-240V DELTA SECONDARY-120/208V WYE

Permit Reviews

Permit Number - TC-COM-0226-00166
Permit Status: In review
Permit Description: Install a parking structure solar array. SCOPE OF WORK SYSTEM SIZE : STC : 84 X 545W= 45.78 KW DC PTC : 84 X 502.2W = 42.18 KW DC AC SIZE: 60.0 KW AC 84) LONGI SOLAR LR5-72HBD-545M (545W) MODULES (01) SOLIS S5-GC60K-LV-US (208V) INVERTER. Install a new 75KVA TRANSFORMER PRIMARY-240V DELTA SECONDARY-120/208V WYE
Start Date Submittal Complete Date Status  
03/13/2026 COMMERCIAL REVIEW - FULL v.2 N/A IN REVIEW Review Details
02/04/2026 COMMERCIAL REVIEW - FULL v.1 03/03/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0226-00166
Permit Status: In review
Permit Description: Install a parking structure solar array. SCOPE OF WORK SYSTEM SIZE : STC : 84 X 545W= 45.78 KW DC PTC : 84 X 502.2W = 42.18 KW DC AC SIZE: 60.0 KW AC 84) LONGI SOLAR LR5-72HBD-545M (545W) MODULES (01) SOLIS S5-GC60K-LV-US (208V) INVERTER. Install a new 75KVA TRANSFORMER PRIMARY-240V DELTA SECONDARY-120/208V WYE
Total Outstanding Activity Conditions - 6
Date Name
02/04/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/27/2026 SPECIAL INSPECTION INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED.
02/27/2026 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/27/2026 SPECIAL INSPECTION INSPECTION OF SOILS IS REQUIRED.
02/27/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
02/27/2026 SPECIAL INSPECTION INSPECTION OF STRUCTURAL STEEL IS REQUIRED.