Permit: TC-COM-0226-00159
Permit Details
Apply Date:
02/03/2026
Applicant:
Harold Farnsworth
Description:
Interior alteration of existing Del Taco to be converted to an Angies
Permit Reviews
Permit Number - TC-COM-0226-00159
Permit Status: Complete
Permit Description: Interior alteration of existing Del Taco to be converted to an Angies
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/15/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/16/2026 | REQUIRES RESUBMIT |
| 03/25/2026 | ADMINISTRATIVE v.2 | 03/25/2026 | APPROVED |
| 04/20/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 04/21/2026 | REQUIRES RESUBMIT |
| 03/11/2026 | ADMINISTRATIVE v.1 | 03/11/2026 | REQUIRES RESUBMIT |
| 04/21/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 04/22/2026 | APPROVED |
| 02/06/2026 | COMMERCIAL REVIEW - FULL v.1 | 03/09/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0226-00159
Permit Status: Complete
Permit Description: Interior alteration of existing Del Taco to be converted to an Angies
| Date | Description | Comments |
|---|---|---|
| 03/03/2026 | AIR BALANCING REPORT IS REQUIRED. | |
| 02/06/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/04/2026 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 03/03/2026 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 02/06/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/03/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0226-00159
Permite Description: Interior alteration of existing Del Taco to be converted to an Angies
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2026 | COT - LCPL - Plumbing Above Ceiling | N/A | Not Ready | |
| 03/27/2026 | COT - LCBU - Framing | N/A | Partial Pass | |
| 03/27/2026 | COT - LCME - Mechanical Intermediate | N/A | Not Ready | |
| 03/27/2026 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
| 03/27/2026 | COT - LCEL - Electrical Above Ceiling | N/A | Not Ready | Several MC cables are laying on grid please support off of grid remove unused wiring in ceiling area please ensure air diffusers and lighting are supported by seismic wires were appropriate |
| 03/27/2026 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | |
| 04/15/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 03/27/2026 | COT - LCEL - Outdoor Lighting | N/A | Not Ready | |
| 04/17/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | Approved for TCO level4. POA permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0226-00159
Permit Description: Interior alteration of existing Del Taco to be converted to an Angies
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2026 | COT - LCPL - Gas Pressure Test | Passed | ||
| 04/01/2026 | COT - BULD - SWG Clearance | Passed | 4/1/26 Southwest Gas Clearance: SWG |
|
| 04/07/2026 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 04/07/2026 | COT - LCBU - Framing | Passed | ||
| 04/07/2026 | COT - LCME - Mechanical Intermediate | Passed | ||
| 04/07/2026 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 04/15/2026 | COT - LCME - Mechanical Final | Passed | ||
| 04/15/2026 | ENGR Engineering Final | Passed | Site is safe and accessible, complete in accordance with approved plans. | |
| 04/15/2026 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 04/15/2026 | COT - LCEL - Electrical Intermediate | Passed | ||
| 04/15/2026 | COT - FCON - Hood System - Final | Passed | ||
| 04/16/2026 | COT - LCBU - Building Final | Passed | ||
| 04/16/2026 | COT - LCEL - Electrical Final | Passed | ||
| 04/16/2026 | COT - LCPL - Plumbing Final | Passed | ||
| 04/16/2026 | COT - LCEL - Outdoor Lighting | Passed | ||
| 04/22/2026 | COT - FCON - Fire - Final | Passed |