Permit: TC-COM-0226-00149
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
6121 E BROADWAY BL UNIT 133
Address NEW:
6121 E BROADWAY BL UNIT 133
Apply Date:
02/02/2026
Applicant:
Anthony Capps
Description:
Structural roof repairs
Permit Reviews
Permit Number - TC-COM-0226-00149
Permit Status: Inspections
Permit Description: Structural roof repairs
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/05/2026 | COMMERCIAL REVIEW - FULL v.1 | 03/02/2026 | APPROVED |
| 03/11/2026 | ADMINISTRATIVE v.1 | 03/11/2026 | REQUIRES RESUBMIT |
| 03/10/2026 | SPECIAL INSPECTION REVIEW v.1 | 03/10/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0226-00149
Permit Status: Inspections
Permit Description: Structural roof repairs
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 02/27/2026 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 02/27/2026 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0226-00149
Permit Status: Inspections
Permit Description: Structural roof repairs
| Date | Description | Comments |
|---|---|---|
| 02/05/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/05/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/27/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0226-00149
Permite Description: Structural roof repairs
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2026 | COT - LCBU - Framing | N/A | Re-inspection required | 1. Steel columns are missing per plan 2. B2 Glulam is missing per plan 3. Glulam schedule is for 18" and currently they are 15". 4. Hangars for 2x4 joist at overhang looks used and is for 2x6s. ****Update plans to reflect current conditions****. |
| 10/23/2026 | COT - LCEL - Electrical Final | N/A | Not Ready | |
| 10/23/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 10/23/2026 | COT - LCME - Mechanical Final | N/A | Not Applicable |