Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address:
5015 S 12TH AV
Address NEW:
5015 S 12TH AV
Apply Date:
02/01/2026
Applicant:
Angelo Vassallo
Description:
Install new gas line for stove, (REV. #1 NEW GREASE INTERCEPTOR, RESTROOM ADA COMPLIANCE, NEW KITECHEN EQUIPMENT, NEW SEWER CONNECTION.)

Permit Reviews

Permit Number - TC-COM-0226-00147
Permit Status: Inspections
Permit Description: Install new gas line for stove, (REV. #1 NEW GREASE INTERCEPTOR, RESTROOM ADA COMPLIANCE, NEW KITECHEN EQUIPMENT, NEW SEWER CONNECTION.)
Start Date Submittal Complete Date Status  
06/22/2026 COMMERCIAL REVIEW - FULL REVISION v.1 07/14/2026 REQUIRES RESUBMIT Review Details
02/03/2026 COMMERCIAL REVIEW - LIMITED v.1 02/26/2026 APPROVED Review Details
07/29/2026 COMMERCIAL REVIEW - FULL REVISION v.2 08/25/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0226-00147
Permit Status: Inspections
Permit Description: Install new gas line for stove, (REV. #1 NEW GREASE INTERCEPTOR, RESTROOM ADA COMPLIANCE, NEW KITECHEN EQUIPMENT, NEW SEWER CONNECTION.)
Total Outstanding Activity Conditions - 5
Date Name
08/21/2026 Prior to Final - Required Documents - AIR BALANCING REPORT IS REQUIRED.
08/21/2026 Prior to Final - Required Documents - COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
08/21/2026 WATER STERILIZATION REPORT IS REQUIRED.
08/27/2026 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor.
08/27/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Conditions

Permit Number - TC-COM-0226-00147
Permit Status: Inspections
Permit Description: Install new gas line for stove, (REV. #1 NEW GREASE INTERCEPTOR, RESTROOM ADA COMPLIANCE, NEW KITECHEN EQUIPMENT, NEW SEWER CONNECTION.)
Date Description Comments
02/03/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0226-00147
Permite Description: Install new gas line for stove, (REV. #1 NEW GREASE INTERCEPTOR, RESTROOM ADA COMPLIANCE, NEW KITECHEN EQUIPMENT, NEW SEWER CONNECTION.)
Total Outstanding Inspections - 14
Last Inspection Date Description Inspector Results Comments
09/25/2026 COT - LCBU - Framing N/A Re-inspection required 9/25/26: add shot pins at restroom's sill plate 6" at the end of walls and 24' o.c., missing blocking for grab bars-see plans for installation requirements. All top plate penetrations shall be fire foamed.
09/25/2026 BULD - Electrical Clearance N/A Not Ready 9/25/26: not ready.
09/25/2026 COT - BULD - SWG Clearance N/A Not Ready 9/25/26: not ready.
COT - FCON - Hood System - Final N/A Not Ready
09/25/2026 COT - LCME - Mechanical Final N/A Not Ready 9/25/26: not ready.
09/25/2026 COT - LCPL - Plumbing Final N/A Not Ready 9/25/26: not ready.
09/25/2026 COT - LCEL - Electrical Intermediate N/A Not Ready 9/25/26: not ready.
09/25/2026 COT - LCME - Kitchen Hood N/A Not Ready 9/25/26: not ready.
09/25/2026 COT - LCPL - Gas Pressure Test N/A Not Ready 9/25/26: not ready.
09/25/2026 COT - LCPL - Rough Soil N/A Re-inspection required 9/25/26: restroom underground plumbing not per plans. Install per plans, place DWV under test and reschedule when ready.
09/25/2026 COT - LCPL - Gas Final N/A Not Ready 9/25/26: not ready.
09/25/2026 COT - LCEL - Electrical Final N/A Not Ready 9/25/26: not ready.
09/25/2026 COT - LCBU - Building Final N/A Not Ready 9/25/26: not ready.
COT - FCON - Fire - Final N/A Not Ready

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
2026246 RASPADOS RIO SONORA STRUC CALCS_SEALED (1)_V1.PDF DOCUMENTS VIEW
CONS-2607-24_MIKADO_5015 S 12TH AVE_COMPILED SET-5015-12TH-AV_V2.PDF DOCUMENTS VIEW
RESPONSE LETTER_RASPODOS RIO SONORA 7_13_26-2026-07-27_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-RASPADOS RIO SONORA GAS TEMPLATE_V1.PDF DOCUMENTS VIEW