Permit: TC-COM-0225-00273
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
2936 N STONE AV
Address NEW:
2936 N STONE AV
Apply Date:
02/11/2025
Applicant:
Jeff Shoemaker
Description:
Replacing existing PV system with all new PV, roof mounted 17 panel, 6.715kW
Permit Reviews
Permit Number - TC-COM-0225-00273
Permit Status: Inspections complete
Permit Description: Replacing existing PV system with all new PV, roof mounted 17 panel, 6.715kW
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/30/2025 | COMMERCIAL REVIEW - FULL v.2 | 06/30/2025 | REQUIRES RESUBMIT |
| 02/11/2025 | COMMERCIAL REVIEW - FULL v.1 | 03/12/2025 | REQUIRES RESUBMIT |
| 07/01/2025 | COMMERCIAL REVIEW - FULL v.3 | 07/21/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0225-00273
Permit Status: Inspections complete
Permit Description: Replacing existing PV system with all new PV, roof mounted 17 panel, 6.715kW
| Date | Description | Comments |
|---|---|---|
| 07/18/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0225-00273
Permite Description: Replacing existing PV system with all new PV, roof mounted 17 panel, 6.715kW
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2025 | COT - FCON - Fire - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0225-00273
Permit Description: Replacing existing PV system with all new PV, roof mounted 17 panel, 6.715kW
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2025 | COT - CSOL - Electrical Underground Solar Project | Passed | Approved electrical conduit from panel to solar equipment,okay to backfill progress areas | |
| 09/02/2025 | COT - CSOL - Electrical Final Solar Project | Passed | ||
| 09/02/2025 | COT - LCBU - Building Final | Passed | ||
| 09/02/2025 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
| 09/02/2025 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
| 09/02/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |