Permit: TC-COM-0225-00236
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2707 E BROADWAY BL
Address NEW:
2707 E BROADWAY BL
Apply Date:
02/05/2025
Applicant:
Andrew Venne
Description:
Interior Remodel
Permit Reviews
Permit Number - TC-COM-0225-00236
Permit Status: Complete
Permit Description: Interior Remodel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/28/2025 | REQUIRES RESUBMIT |
| 03/20/2025 | COMMERCIAL REVIEW - FULL v.2 | 04/15/2025 | APPROVED |
| 04/15/2025 | RESTAMP - COMMERCIAL v.1 | 04/21/2025 | APPROVED |
| 08/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/29/2025 | APPROVED |
| 02/08/2025 | COMMERCIAL REVIEW - FULL v.1 | 03/04/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0225-00236
Permit Status: Complete
Permit Description: Interior Remodel
| Date | Description | Comments |
|---|---|---|
| 04/15/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 02/08/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/28/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 02/08/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/15/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0225-00236
Permite Description: Interior Remodel
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2025 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | Electric underground conduits for 400 amp service to existing building. Ok to cover progress areas. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0225-00236
Permit Description: Interior Remodel
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2025 | COT - LCPL - Rough Soil | Passed | Ok to cover interior underground plumbing (sewer, domestic water, waste lines, grease lines). | |
| 06/24/2025 | COT - LCBU - Framing | Passed | Ok to insulate and cover walls throughout | |
| 06/24/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 06/24/2025 | COT - LCME - Mechanical Above Ceiling | Passed | ||
| 06/24/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 06/24/2025 | COT - LCME - Mechanical Intermediate | Passed | ||
| 06/24/2025 | COT - LCPL - Gas Pressure Test | Passed | ||
| 06/24/2025 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 06/24/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 06/27/2025 | BULD - Electrical Clearance | Passed | Ok to set meter and energize service. | |
| 08/28/2025 | COT - BULD - SWG Clearance | Passed | Ok to set,commercial meter and new service | |
| 08/28/2025 | COT - LCBU - Building Final | Passed | ||
| 08/28/2025 | COT - LCEL - Electrical Final | Passed | ||
| 08/28/2025 | COT - LCME - Mechanical Final | Passed | ||
| 08/28/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 08/28/2025 | ENGR Engineering Final | Passed | Site is safe and accessible. | |
| 08/28/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 08/28/2025 | COT - LCBU - Preslab | Passed | ||
| 08/28/2025 | COT - LCEL - Grounding/Bonding | Passed | ||
| 09/12/2025 | COT - FCON - Fire - Final | Passed | ||
| 09/12/2025 | COT - FCON - Hood System - Final | Passed | passed by chris basualdua prior to this inspection. | |
| 09/12/2025 | COT - LCPL - Sewer | Passed |