Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0224-00307
Permit Details
Apply Date:
02/15/2024
Applicant:
Brock Richards
Description:
Ground-up Car Wash Tunnel and associated facilities. all site improvements per development plan.
Permit Reviews
Permit Number - TC-COM-0224-00307
Permit Status: Issued
Permit Description: Ground-up Car Wash Tunnel and associated facilities.
all site improvements per development plan.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/14/2024 | COMMERCIAL REVIEW - FULL v.3 | 06/11/2024 | REQUIRES RESUBMIT |
10/30/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/24/2024 | REQUIRES RESUBMIT |
11/26/2024 | COMMERCIAL REVIEW - FULL v.2 | 12/22/2024 | REQUIRES RESUBMIT |
04/09/2024 | COMMERCIAL REVIEW - FULL v.2 | 05/09/2024 | REQUIRES RESUBMIT |
01/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/30/2025 | APPROVED |
07/29/2024 | RESTAMP - COMMERCIAL v.1 | 08/02/2024 | APPROVED |
07/22/2024 | COMMERCIAL REVIEW - FULL v.5 | 07/29/2024 | APPROVED |
01/13/2025 | COMMERCIAL REVIEW - FULL v.3 | 01/19/2025 | APPROVED |
09/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/17/2024 | APPROVED |
01/19/2025 | RESTAMP - COMMERCIAL v.1 | 01/22/2025 | APPROVED |
06/13/2024 | COMMERCIAL REVIEW - FULL v.4 | 07/17/2024 | REQUIRES RESUBMIT |
02/16/2024 | COMMERCIAL REVIEW - FULL v.1 | 03/25/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0224-00307
Permit Status: Issued
Permit Description: Ground-up Car Wash Tunnel and associated facilities.
all site improvements per development plan.
Total Outstanding Activity Conditions - 13
Date | Name |
---|---|
06/21/2024 | AIR BALANCING REPORT IS REQUIRED. |
06/21/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
06/21/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
06/21/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
06/21/2024 | Masonry Inspection Report submittal review is required. |
06/21/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
06/21/2024 | Post-Installed Anchor Inspection Report is required. |
06/21/2024 | Please submit a separate permit for the on-site private sewer associated with this project. |
06/21/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
06/21/2024 | SPECIAL INSPECTION FOR EFIS IS REQUIRED |
06/21/2024 | SPECIAL INSPECTION FOR STRUCTURAL STEEL IS REQUIRED |
06/21/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
06/21/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0224-00307
Permit Status: Issued
Permit Description: Ground-up Car Wash Tunnel and associated facilities.
all site improvements per development plan.
Date | Description | Comments |
---|---|---|
02/16/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
08/02/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) TD-DEV-0224-00042 permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
02/16/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/01/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
06/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0224-00307
Permite Description: Ground-up Car Wash Tunnel and associated facilities.
all site improvements per development plan.
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/26/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Retaining wall, trash enclosure, and vacuum pump enclosure. |
12/06/2024 | COT - HCBU - Stem Wall/Retaining Wall | N/A | Partial Pass | Building |
11/19/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | Power for North vacums. |
11/26/2024 | COT - HCPL - Rough Soil | N/A | Partial Pass | Mechanical room plumbing. |
12/02/2024 | COT - HCPL - Plumbing Intermediate | N/A | Canceled | |
03/03/2025 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | Hard lids in bathrooms. |
03/03/2025 | ENGR Engineering Final | N/A | Partial Pass | Call tractor go to remove part of the sidewalk on the south west corner of the project so it stays into private property and they can get the 5% slope on it running slope |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0224-00307
Permit Description: Ground-up Car Wash Tunnel and associated facilities.
all site improvements per development plan.
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/10/2024 | COT - HCPL - Yard Water Line | Passed | ||
12/20/2024 | COT - HCBU - Masonry Pregrout | Passed | 14' | |
01/10/2025 | COT - HCEL - Electrical Underground | Passed | ||
01/10/2025 | COT - HCPL - Rough Soil | Passed | ||
01/15/2025 | COT - HCBU - Preslab | Passed | ||
01/27/2025 | COT - HCEL - Electrical Above Ceiling | Passed | ||
01/27/2025 | COT - HCBU - Roof Nailing | Passed | ||
01/30/2025 | COT - HCBU - Framing | Passed | ||
02/05/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
02/05/2025 | COT - HCME - Mechanical Above Ceiling | Passed | ||
02/06/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
02/21/2025 | COT - HCBU - Interior Shear Bracing | Passed | ||
02/26/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed |