Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Building Final
Permit Number - TC-COM-0224-00307
Inspection Description - COT - HCBU - Building Final
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/04/2025 | COT - HCBU - Building Final | Re-inspection required | 4-4-25, adjust both ADA restroom doors to 5 pounds, install restroom signage, paint all exterior plastic at rooftop and secure HVAC whip off roof decking. | |
| 04/08/2025 | COT - HCBU - Building Final | Partial Pass | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. Masonry Inspection Report submittal review is required. Post-Installed Anchor Inspection Report is required. Please submit a separate permit for the on-site private sewer associated with this project. SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. SPECIAL INSPECTION FOR STRUCTURAL STEEL IS REQUIRED SPECIAL INSPECTION FOR EFIS IS REQUIRED SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
|
| 04/15/2025 | COT - HCBU - Building Final | Partial Pass | SI approvals are all that remain. Okay for TCO | |
| 06/20/2025 | COT - HCBU - Building Final | Passed |