Permit: TC-COM-0224-00306
Permit Details
Apply Date:
02/15/2024
Applicant:
Kerri Drown
Description:
Tenant Interior Alteration of existing tenant space for a new Starbucks coffee shop. Signage under separate permit. Starbucks will occupy Suite A
Permit Reviews
Permit Number - TC-COM-0224-00306
Permit Status: Complete
Permit Description: Tenant Interior Alteration of existing tenant space for a new Starbucks coffee shop. Signage under separate permit. Starbucks will occupy Suite A
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/06/2024 | APPROVED |
07/29/2024 | RESTAMP - COMMERCIAL v.1 | 08/02/2024 | APPROVED |
04/09/2024 | COMMERCIAL REVIEW - FULL v.2 | 05/14/2024 | REQUIRES RESUBMIT |
05/31/2024 | RESTAMP - COMMERCIAL v.1 | 06/04/2024 | APPROVED |
08/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/22/2024 | APPROVED |
02/16/2024 | COMMERCIAL REVIEW - FULL v.1 | 03/25/2024 | REQUIRES RESUBMIT |
05/20/2024 | COMMERCIAL REVIEW - FULL v.3 | 05/31/2024 | APPROVED |
06/18/2024 | COMMERCIAL REVIEW - FULL v.1 | 07/23/2024 | REQUIRES RESUBMIT |
09/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/13/2024 | APPROVED |
07/24/2024 | COMMERCIAL REVIEW - FULL v.2 | 07/29/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0224-00306
Permit Status: Complete
Permit Description: Tenant Interior Alteration of existing tenant space for a new Starbucks coffee shop. Signage under separate permit. Starbucks will occupy Suite A
Date | Description | Comments |
---|---|---|
02/16/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
02/16/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
06/06/2024 | Submit revised plans per Robert Sherry | |
06/04/2024 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor. | |
09/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0224-00306
Permite Description: Tenant Interior Alteration of existing tenant space for a new Starbucks coffee shop. Signage under separate permit. Starbucks will occupy Suite A
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/09/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Awaiting Sprinkler permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0224-00306
Permit Description: Tenant Interior Alteration of existing tenant space for a new Starbucks coffee shop. Signage under separate permit. Starbucks will occupy Suite A
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/29/2024 | COT - BULD - SWG Clearance | Passed | Pressure tested; Ok to set commercial gas meter | |
07/18/2024 | COT - HCEL - Electrical Progress | Passed | In wall electric for back half of site. | |
07/18/2024 | COT - HCME - Mechanical Progress | Passed | In wall mechanical. Ok to,insulate a d cover walls in back half of suite. | |
07/18/2024 | COT - HCPL - Plumbing Progress | Passed | ||
07/29/2024 | COT - HCBU - Framing | Passed | 7/29/24: front half of Suite passed | |
08/16/2024 | COT - HCBU - Building Above Ceiling | Passed | Ok to set ceiling tiles | |
08/16/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
08/16/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
08/16/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
08/26/2024 | BULD - Electrical Clearance | Passed | Ok to set meter and energize system | |
08/26/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
08/26/2024 | COT - HCPL - Plumbing Intermediate | Passed | Bacteria test completed; results to be forwarded to Robert Sherry. | |
08/26/2024 | COT - HCME - Mechanical Intermediate | Passed | Air balance test results to be forwarded to,Robert Sherry. | |
08/26/2024 | COT - HCBU - Building Progress | Passed | ||
09/05/2024 | COT - HCPL - Plumbing Final | Passed | Bacteria test results forwarded to Robert Sherry. | |
09/05/2024 | COT - HCEL - Electrical Final | Passed | ||
09/11/2024 | COT - FCON - Sprinkler - Final | Passed | CBASS passed Fire Sprinkler permit | |
09/09/2024 | COT - HCME - Mechanical Final | Passed | Air balance test results to be forwarded to Robert Sherry. | |
09/09/2024 | COT - FCON - Alarm - Final | Passed | ||
09/09/2024 | COT - HCBU - Building Final | Passed | Pending Fire Finals. | |
09/10/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
09/10/2024 | ENGR Engineering Final | Passed | ||
09/11/2024 | COT - FCON - Fire - Final | Passed | ||
09/11/2024 | COT - HCBU - CofO | Passed |