Permit: TC-COM-0223-00684
Permit Details
Apply Date:
02/22/2023
Applicant:
Nikki Martin
Description:
Provide and install new Square D 250amp Panelboard for Temporary Chiller System. New Panelboard (Panel AC-4) fed from existing MDS #20-22-24.
Permit Reviews
Permit Number - TC-COM-0223-00684
Permit Status: Complete
Permit Description: Provide and install new Square D 250amp Panelboard for Temporary Chiller System. New Panelboard (Panel AC-4) fed from existing MDS #20-22-24.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/03/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 03/30/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0223-00684
Permite Description: Provide and install new Square D 250amp Panelboard for Temporary Chiller System. New Panelboard (Panel AC-4) fed from existing MDS #20-22-24.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2023 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | Electrical rough in and wiring is complete for new electrical panel & 8 new 220 volt outlets, & 3 exterior weatherproof outlets outside the building. Conduit is ran from distribution switchgear to new panel with electrical wires inside conduit. Waiting for okay to make final connection to breaker in switchgear. |
| 04/17/2023 | COT - LCEL - Electrical Final | N/A | Not Applicable | duplicate |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0223-00684
Permit Description: Provide and install new Square D 250amp Panelboard for Temporary Chiller System. New Panelboard (Panel AC-4) fed from existing MDS #20-22-24.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2023 | COT - LCEL - Electrical Intermediate | Passed | 4-17-23: Final connection to switchgear is complete. System is energized and operational. |