Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 04/12/2023 |
COT - LCEL - Electrical Intermediate |
|
Partial Pass |
Electrical rough in and wiring is complete for new electrical panel & 8 new 220 volt outlets, & 3 exterior weatherproof outlets outside the building. Conduit is ran from distribution switchgear to new panel with electrical wires inside conduit. Waiting for okay to make final connection to breaker in switchgear. |
| 04/17/2023 |
COT - LCEL - Electrical Intermediate |
|
Passed |
4-17-23: Final connection to switchgear is complete. System is energized and operational. |