Permit: TC-COM-0126-00112
Permit Details
Apply Date:
01/26/2026
Applicant:
jose ceja
Description:
FOREST SPA - The scope of this project is to request a certificate of occupancy, no revisions to the existing commercial building or site. Includes the extension of the Mechanical and Plumbing systems
Permit Reviews
Permit Number - TC-COM-0126-00112
Permit Status: Issued
Permit Description: FOREST SPA - The scope of this project is to request a certificate of occupancy, no revisions to the existing commercial building or site. Includes the extension of the Mechanical and Plumbing systems
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/28/2026 | COMMERCIAL REVIEW - FULL v.1 | 02/19/2026 | REQUIRES RESUBMIT |
| 03/19/2026 | COMMERCIAL REVIEW - FULL v.2 | 04/08/2026 | APPROVED |
| 07/31/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/03/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0126-00112
Permit Status: Issued
Permit Description: FOREST SPA - The scope of this project is to request a certificate of occupancy, no revisions to the existing commercial building or site. Includes the extension of the Mechanical and Plumbing systems
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/06/2026 | AIR BALANCING REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0126-00112
Permit Status: Issued
Permit Description: FOREST SPA - The scope of this project is to request a certificate of occupancy, no revisions to the existing commercial building or site. Includes the extension of the Mechanical and Plumbing systems
| Date | Description | Comments |
|---|---|---|
| 01/28/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/06/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0126-00112
Permite Description: FOREST SPA - The scope of this project is to request a certificate of occupancy, no revisions to the existing commercial building or site. Includes the extension of the Mechanical and Plumbing systems
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2026 | COT - LCBU - Building Final | N/A | Re-inspection required | 1. Need 18" grab bar for W.C 2. Run T/P line within 2-6" of drain pan. 3. Request Fire Final, ROW and Engineering Final as well. |
| 07/22/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 07/22/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 07/22/2026 | COT - LCME - Mechanical Intermediate | N/A | Not Applicable | |
| 07/22/2026 | COT - LCPL - Rough Soil | N/A | Not Applicable | |
| 07/22/2026 | COT - LCPL - Plumbing Intermediate | N/A | Not Applicable | |
| 07/22/2026 | COT - LCBU - Framing | N/A | Not Applicable | |
| 07/22/2026 | COT - LCBU - Preslab | N/A | Not Applicable |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0126-00112
Permit Description: FOREST SPA - The scope of this project is to request a certificate of occupancy, no revisions to the existing commercial building or site. Includes the extension of the Mechanical and Plumbing systems
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2026 | COT - FCON - Fire - Final | Passed | ||
| 07/15/2026 | COT - LCBU - Building Final | Passed | Passed | |
| 07/22/2026 | COT - LCME - Mechanical Final | Passed | Passed | |
| 07/22/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 07/22/2026 | COT - LCPL - Plumbing Final | Passed | Passed | |
| 07/22/2026 | ENGR Engineering Final | Passed | ||
| 07/22/2026 | COT - LCEL - Electrical Final | Passed | Passed |