Permit: TC-COM-0126-00049
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
10165 E OLD VAIL RD UNIT 131
Address NEW:
10165 E OLD VAIL RD UNIT 131
Apply Date:
01/14/2026
Applicant:
Anthony Mills
Description:
Tenant improvement of existing space for Pilates studio use
Permit Reviews
Permit Number - TC-COM-0126-00049
Permit Status: Complete
Permit Description: Tenant improvement of existing space for Pilates studio use
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/10/2026 | COMMERCIAL REVIEW - LIMITED v.2 | 02/25/2026 | APPROVED |
| 03/24/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 04/06/2026 | REQUIRES RESUBMIT |
| 05/08/2026 | SPECIAL INSPECTION REVIEW v.1 | 05/12/2026 | APPROVED |
| 02/26/2026 | ADMINISTRATIVE v.2 | 02/26/2026 | APPROVED |
| 05/12/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/13/2026 | APPROVED |
| 02/25/2026 | ADMINISTRATIVE v.1 | 02/25/2026 | REQUIRES RESUBMIT |
| 01/14/2026 | COMMERCIAL REVIEW - LIMITED v.1 | 02/04/2026 | REQUIRES RESUBMIT |
| 04/07/2026 | COMMERCIAL REVIEW - FULL REVISION v.2 | 04/10/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0126-00049
Permit Status: Complete
Permit Description: Tenant improvement of existing space for Pilates studio use
| Date | Description | Comments |
|---|---|---|
| 01/29/2026 | AIR BALANCING REPORT IS REQUIRED. | |
| 01/14/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 05/11/2026 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 01/14/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/23/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0126-00049
Permite Description: Tenant improvement of existing space for Pilates studio use
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2026 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | 3-12-26: not ready for intermediates. |
| 03/12/2026 | COT - LCPL - Rough Soil | N/A | Re-inspection required | 3-12-26: underground plumbing layout modified- have architect of record submit a revision to the city for review/approval. Underground plumbing verified under test. Okay to backfill at own risk. |
| 04/22/2026 | COT - LCEL - Electrical Above Ceiling | N/A | Partial Pass | 4-22-26: okay to tape & texture 103A, 104A, 105A. |
| 05/07/2026 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
| 05/07/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | Approved for TCO level 4. Still need sprinkler permit |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0126-00049
Permit Description: Tenant improvement of existing space for Pilates studio use
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2026 | BULD - Electrical Clearance | Passed | 3-12-26: okay to meter Suite 131. INCR clearance issued to TEP. | |
| 04/15/2026 | COT - LCME - Mechanical Intermediate | Passed | 4-15-26: mechanical intermediates approved. | |
| 04/15/2026 | COT - LCPL - Plumbing Intermediate | Passed | 4-15-26: plumbing intermediates approved. | |
| 04/15/2026 | COT - LCEL - Electrical Intermediate | Passed | 4-15-26: electrical intermediates approved. | |
| 04/15/2026 | COT - LCPL - Rough Soil | Passed | 4-15-26: approved. | |
| 04/15/2026 | COT - LCEL - Electrical Underground | Passed | 4-15-26: approved. | |
| 05/06/2026 | COT - LCME - Mechanical Final | Passed | 5-6-26: mechanical final approved. | |
| 05/06/2026 | COT - LCEL - Electrical Above Ceiling | Passed | 5-6-26: electrical above ceiling approved. | |
| 05/07/2026 | COT - LCBU - Preslab | Passed | 5-7- 26: preslab approved. | |
| 05/07/2026 | COT - LCPL - Plumbing Final | Passed | 5-7-26: plumbing final approved. | |
| 05/07/2026 | COT - LCEL - Electrical Final | Passed | 5-7-26: electrical final approved. | |
| 05/07/2026 | COT - LCBU - Building Final | Passed | 5-7-26: building final approved. Note: see pending inspections and conditions. |
|
| 05/13/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 05/13/2026 | COT - FCON - Fire - Final | Passed |