Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/14/2026
Applicant:
Anthony Mills
Description:
Tenant improvement of existing space for Pilates studio use

Permit Reviews

Permit Number - TC-COM-0126-00049
Permit Status: Complete
Permit Description: Tenant improvement of existing space for Pilates studio use
Start Date Submittal Complete Date Status  
02/10/2026 COMMERCIAL REVIEW - LIMITED v.2 02/25/2026 APPROVED Review Details
03/24/2026 COMMERCIAL REVIEW - FULL REVISION v.1 04/06/2026 REQUIRES RESUBMIT Review Details
05/08/2026 SPECIAL INSPECTION REVIEW v.1 05/12/2026 APPROVED Review Details
02/26/2026 ADMINISTRATIVE v.2 02/26/2026 APPROVED Review Details
05/12/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/13/2026 APPROVED Review Details
02/25/2026 ADMINISTRATIVE v.1 02/25/2026 REQUIRES RESUBMIT Review Details
01/14/2026 COMMERCIAL REVIEW - LIMITED v.1 02/04/2026 REQUIRES RESUBMIT Review Details
04/07/2026 COMMERCIAL REVIEW - FULL REVISION v.2 04/10/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0126-00049
Permit Status: Complete
Permit Description: Tenant improvement of existing space for Pilates studio use
Date Description Comments
01/29/2026 AIR BALANCING REPORT IS REQUIRED.
01/14/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
05/11/2026 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
01/14/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
02/23/2026 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0126-00049
Permite Description: Tenant improvement of existing space for Pilates studio use
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
03/12/2026 COT - LCPL - Plumbing Intermediate N/A Not Ready 3-12-26: not ready for intermediates.
03/12/2026 COT - LCPL - Rough Soil N/A Re-inspection required 3-12-26: underground plumbing layout modified- have architect of record submit a revision to the city for review/approval. Underground plumbing verified under test. Okay to backfill at own risk.
04/22/2026 COT - LCEL - Electrical Above Ceiling N/A Partial Pass 4-22-26: okay to tape & texture 103A, 104A, 105A.
05/07/2026 COT - FCON - Sprinkler - Final N/A Not Ready
05/07/2026 COT - FCON - Fire - Final N/A Partial Pass Approved for TCO level 4. Still need sprinkler permit

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0126-00049
Permit Description: Tenant improvement of existing space for Pilates studio use
Total Completed Inspections - 14
Date Description Inspector Results Comments
03/12/2026 BULD - Electrical Clearance Passed 3-12-26: okay to meter Suite 131. INCR clearance issued to TEP.
04/15/2026 COT - LCME - Mechanical Intermediate Passed 4-15-26: mechanical intermediates approved.
04/15/2026 COT - LCPL - Plumbing Intermediate Passed 4-15-26: plumbing intermediates approved.
04/15/2026 COT - LCEL - Electrical Intermediate Passed 4-15-26: electrical intermediates approved.
04/15/2026 COT - LCPL - Rough Soil Passed 4-15-26: approved.
04/15/2026 COT - LCEL - Electrical Underground Passed 4-15-26: approved.
05/06/2026 COT - LCME - Mechanical Final Passed 5-6-26: mechanical final approved.
05/06/2026 COT - LCEL - Electrical Above Ceiling Passed 5-6-26: electrical above ceiling approved.
05/07/2026 COT - LCBU - Preslab Passed 5-7- 26: preslab approved.
05/07/2026 COT - LCPL - Plumbing Final Passed 5-7-26: plumbing final approved.
05/07/2026 COT - LCEL - Electrical Final Passed 5-7-26: electrical final approved.
05/07/2026 COT - LCBU - Building Final Passed 5-7-26: building final approved.
Note: see pending inspections and conditions.
05/13/2026 COT - FCON - Sprinkler - Final Passed
05/13/2026 COT - FCON - Fire - Final Passed