Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
2681 E WIEDING RD
Apply Date:
01/24/2025
Applicant:
Sergio Garcia
Description:
Build cold panel box 20' x 50'

Permit Reviews

Permit Number - TC-COM-0125-00159
Permit Status: Complete
Permit Description: Build cold panel box 20' x 50'
Start Date Submittal Complete Date Status  
03/04/2025 COMMERCIAL REVIEW - LIMITED v.4 03/18/2025 APPROVED Review Details
03/18/2025 RESTAMP - COMMERCIAL v.1 03/18/2025 APPROVED Review Details
02/06/2025 COMMERCIAL REVIEW - LIMITED v.2 02/06/2025 REQUIRES RESUBMIT Review Details
01/31/2025 COMMERCIAL REVIEW - LIMITED v.1 01/31/2025 REQUIRES RESUBMIT Review Details
02/11/2025 COMMERCIAL REVIEW - LIMITED v.3 02/26/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0125-00159
Permit Status: Complete
Permit Description: Build cold panel box 20' x 50'
Date Description Comments
01/31/2025 Permit Address will need to be reflected on the construction plan.
01/31/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/11/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0125-00159
Permite Description: Build cold panel box 20' x 50'
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/01/2025 ENGR Engineering Final N/A Not Applicable
04/01/2025 COT - LCEL - Electrical Underground N/A Not Applicable 4-1-25, not applicable
04/03/2025 BULD - Electrical Clearance N/A Not Applicable 4-3-25, not applicable.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0125-00159
Permit Description: Build cold panel box 20' x 50'
Total Completed Inspections - 12
Date Description Inspector Results Comments
04/01/2025 COT - LCPL - Plumbing Final Passed 4-1-25, approved.
04/01/2025 COT - LCME - Mechanical Intermediate Passed 4-1-25, mechanical intermediate approved.
04/01/2025 COT - LCBU - Framing Passed 4-1-25, approved.
04/01/2025 COT - LCEL - Electrical Above Ceiling Passed 4-1-25, approved
04/01/2025 COT - LCEL - Electrical Intermediate Passed 4-1-25, approved.
04/01/2025 COT - LCEL - Grounding/Bonding Passed 4-1-25, grounding/bonding approved.
04/01/2025 COT - LCME - Mechanical Final Passed 4-1-25, mechanical final approved.
04/03/2025 COT - FCON - Fire - Final Passed
04/03/2025 COT - FCON - Sprinkler - Final Passed
04/03/2025 COT - LCBU - Building Final Passed 4-3-25, building final approved.
04/03/2025 COT - LCEL - Electrical Final Passed 4-3-25, electrical final approved.
04/03/2025 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
132617-WALK-IN-MANUAL_V1.PDF DOCUMENTS VIEW
2681 E WIEDING ROAD 030325_V1.PDF DOCUMENTS VIEW