Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/22/2025
Applicant:
Description:
Building D. Remove and replace all interior load centers in each unit with like for like

Permit Reviews

Permit Number - TC-COM-0125-00146
Permit Status: Complete
Permit Description: Building D. Remove and replace all interior load centers in each unit with like for like
Start Date Submittal Complete Date Status  
01/24/2025 COMMERCIAL PDSD SIMPLE REVIEW v.1 01/27/2025 REQUIRES RESUBMIT Review Details
02/13/2025 RESTAMP - COMMERCIAL v.1 02/13/2025 APPROVED Review Details
02/13/2025 COMMERCIAL PDSD SIMPLE REVIEW v.2 02/13/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0125-00146
Permit Status: Complete
Permit Description: Building D. Remove and replace all interior load centers in each unit with like for like
Date Description Comments
01/24/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0125-00146
Permite Description: Building D. Remove and replace all interior load centers in each unit with like for like
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/11/2025 COT - LCEL - Electrical Intermediate N/A Partial Pass Approved interior sub-panel replacements for Building D, units #109, #111- #122, units #209 - #223, #225 - #233 (36)
No electrical clearances are required
07/17/2025 COT - LCEL - Electrical Final N/A Re-inspection required 7/9/25 - Approved interior sub-panel replacements for Building D, units #100 - #108, units #137, #138, #141, #142, units #200 - #208, units #237 - #242 (28)
No electrical clearances are required
7/11/25 - Approved interior sub-panel replacements for Building D, units #109, #111- #122, units #209 - #223, #225 - #233 (36)
No electrical clearances are required

7/15/2025 canceled per contractor.
7/17/25: wiring must be properly marked at terminals, #6 AWG copper required at all load centers for a 50Amp breaker (Rick stated it was a #8 AWG)

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0125-00146
Permit Description: Building D. Remove and replace all interior load centers in each unit with like for like
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/29/2025 COT - LCEL - Electrical Final Passed Approved per G.A. 7/29/2025