Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
151 S GRANADA AV
Address NEW:
151 S GRANADA AV
Apply Date:
01/16/2025
Applicant:
Jack Donovan
Description:
REV2: 1. Sheet G1.0 Per Willdan review, removed reference to alternates, scope shown on documents is the full scope completed 2. Sheets C3.1 and C 3.2 – for reference only, included site sheets from 1/28/26 to address comments on paver and planter coordination 3. Sheet e3.0 and e 4.1 – removed existing unshielded string lights from plan and from OLC calculations Remodel Existing Sosa-Carillo House Associated wtih SD-1024-00104

Permit Reviews

Permit Number - TC-COM-0125-00107
Permit Status: Complete
Permit Description: REV2: 1. Sheet G1.0 Per Willdan review, removed reference to alternates, scope shown on documents is the full scope completed 2. Sheets C3.1 and C 3.2 – for reference only, included site sheets from 1/28/26 to address comments on paver and planter coordination 3. Sheet e3.0 and e 4.1 – removed existing unshielded string lights from plan and from OLC calculations Remodel Existing Sosa-Carillo House Associated wtih SD-1024-00104
Start Date Submittal Complete Date Status  
04/15/2026 SPECIAL INSPECTION REVIEW v.1 04/16/2026 APPROVED Review Details
02/03/2026 COMMERCIAL REVIEW - FULL REVISION v.2 03/03/2026 APPROVED Review Details
04/22/2025 COMMERCIAL REVIEW - FULL v.3 04/25/2025 REQUIRES RESUBMIT Review Details
02/27/2025 COMMERCIAL REVIEW - FULL v.2 03/28/2025 REQUIRES RESUBMIT Review Details
01/23/2026 COMMERCIAL REVIEW - FULL REVISION v.1 01/30/2026 REQUIRES RESUBMIT Review Details
08/19/2025 COMMERCIAL REVIEW - FULL REVISION v.1 09/04/2025 APPROVED Review Details
05/29/2025 RESTAMP - COMMERCIAL v.1 06/02/2025 APPROVED Review Details
04/27/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/28/2026 APPROVED Review Details
08/18/2026 SPECIAL INSPECTION REVIEW v.1 08/20/2026 APPROVED Review Details
01/17/2025 COMMERCIAL REVIEW - FULL v.1 02/10/2025 REQUIRES RESUBMIT Review Details
01/23/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/23/2026 APPROVED Review Details
05/14/2025 COMMERCIAL REVIEW - FULL v.4 05/29/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0125-00107
Permit Status: Complete
Permit Description: REV2: 1. Sheet G1.0 Per Willdan review, removed reference to alternates, scope shown on documents is the full scope completed 2. Sheets C3.1 and C 3.2 – for reference only, included site sheets from 1/28/26 to address comments on paver and planter coordination 3. Sheet e3.0 and e 4.1 – removed existing unshielded string lights from plan and from OLC calculations Remodel Existing Sosa-Carillo House Associated wtih SD-1024-00104
Date Description Comments
01/31/2025 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
01/31/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/02/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/31/2025 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
01/31/2025 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
01/31/2025 SPECIAL INSPECTION FOR INSULATING CONCRETE FILL IS REQUIRED.
01/31/2025 ??? Designs must be submitted and approved prior to ...
01/26/2026 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
01/26/2026 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0125-00107
Permite Description: REV2: 1. Sheet G1.0 Per Willdan review, removed reference to alternates, scope shown on documents is the full scope completed 2. Sheets C3.1 and C 3.2 – for reference only, included site sheets from 1/28/26 to address comments on paver and planter coordination 3. Sheet e3.0 and e 4.1 – removed existing unshielded string lights from plan and from OLC calculations Remodel Existing Sosa-Carillo House Associated wtih SD-1024-00104
Total Outstanding Inspections - 14
Last Inspection Date Description Inspector Results Comments
12/08/2025 COT - HCEL - Electrical Above Ceiling N/A Not Applicable
12/08/2025 COT - BULD - SWG Clearance N/A Not Applicable
12/08/2025 BULD - Electrical Clearance N/A Not Applicable
12/08/2025 COT - HCEL - Grounding/Bonding N/A Partial Pass Partial pass 12/8/25 for west light poles
01/29/2026 COT - HCBU - Building Final N/A Partial Pass Partial pass. Pending other inspections. Provide address for building. 1/29/2026
12/08/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Partial pass 12/8/25 for west light poles
12/08/2025 COT - HCEL - Electrical Underground N/A Partial Pass Partial pass 12/8/25 for west light poles
01/22/2026 COT - HCEL - Outdoor Lighting N/A Re-inspection required 1/22/25: revision for changes to restrooms must be submitted and approved prior to approval. Water sterilization report required, Mirror in restrooms must be no higher than 40" to reflective surface, plumbing incomplete in mechanical room, exterior receptacles shall have appropriate covers at time of final inspection, all cover plates used on exterior of building must be weather rated, emergency lighting not per approved plans missing exit signs throughout (revision submitted 1/22/26 show same set up as original plan), carbon monoxide detector required in mechanical room, hardware at egress doors is none compliant keyed lock are not allowed per IBC 1010.1.9, site work is still in progress and accessible route is currently non compliant. INSPECTION STOPPED.
01/22/2026 COT - HCPL - Plumbing Final N/A Re-inspection required 1/22/25: revision for changes to restrooms must be submitted and approved prior to approval. Water sterilization report required, Mirror in restrooms must be no higher than 40" to reflective surface, plumbing incomplete in mechanical room, exterior receptacles shall have appropriate covers at time of final inspection, all cover plates used on exterior of building must be weather rated, emergency lighting not per approved plans missing exit signs throughout (revision submitted 1/22/26 show same set up as original plan), carbon monoxide detector required in mechanical room, hardware at egress doors is none compliant keyed lock are not allowed per IBC 1010.1.9, site work is still in progress and accessible route is currently non compliant. INSPECTION STOPPED.
10/10/2025 COT - HCPL - Plumbing Intermediate N/A Partial Pass In wall plumbing for restrooms and break room.
01/22/2026 COT - HCEL - Electrical Final N/A Re-inspection required 1/22/25: revision for changes to restrooms must be submitted and approved prior to approval. Water sterilization report required, Mirror in restrooms must be no higher than 40" to reflective surface, plumbing incomplete in mechanical room, exterior receptacles shall have appropriate covers at time of final inspection, all cover plates used on exterior of building must be weather rated, emergency lighting not per approved plans missing exit signs throughout (revision submitted 1/22/26 show same set up as original plan), carbon monoxide detector required in mechanical room, hardware at egress doors is none compliant keyed lock are not allowed per IBC 1010.1.9, site work is still in progress and accessible route is currently non compliant. INSPECTION STOPPED.
12/08/2025 COT - HCME - Mechanical Above Ceiling N/A Not Applicable
12/08/2025 COT - HCPL - Plumbing Above Ceiling N/A Not Applicable
01/29/2026 COT - HCBU - CofO N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0125-00107
Permit Description: REV2: 1. Sheet G1.0 Per Willdan review, removed reference to alternates, scope shown on documents is the full scope completed 2. Sheets C3.1 and C 3.2 – for reference only, included site sheets from 1/28/26 to address comments on paver and planter coordination 3. Sheet e3.0 and e 4.1 – removed existing unshielded string lights from plan and from OLC calculations Remodel Existing Sosa-Carillo House Associated wtih SD-1024-00104
Total Completed Inspections - 29
Date Description Inspector Results Comments
10/09/2025 COT - HCBU - Stem Wall/Retaining Wall Passed Reconstructed stem wall/footing in,four areas on West wall. Ok to place concrete in progress areas.
01/22/2026 COT - HCBU - Building Above Ceiling Passed
01/22/2026 TRSP - ROW - Final/Close-Out Passed
01/22/2026 COT - HCEL - Grounding/Bonding Passed
01/22/2026 COT - HCBU - Exterior Clips/Sheathing Passed
01/29/2026 COT - FCON - Fire - Final Passed
04/09/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
08/31/2026 COT - HCME - Mechanical Final Passed
08/31/2026 COT - HCEL - Electrical Intermediate Passed
08/31/2026 COT - HCPL - Plumbing Progress Passed
08/31/2026 COT - HCBU - Building Final Passed
08/31/2026 COT - HCME - Mechanical Intermediate Passed
08/31/2026 COT - HCBU - Roof Nailing Passed
08/31/2026 COT - HCBU - Excavation/Rebar/Zoning Passed
08/31/2026 COT - HCBU - Framing Passed
08/31/2026 COT - HCEL - Electrical Progress Passed
08/31/2026 COT - HCEL - Electrical Underground Passed
08/31/2026 COT - HCEL - Outdoor Lighting Passed
08/31/2026 COT - HCBU - Preslab Passed
08/31/2026 COT - HCPL - Plumbing Final Passed
08/31/2026 COT - HCME - Venting Passed
08/31/2026 COT - HCPL - Plumbing Intermediate Passed
08/31/2026 COT - HCEL - Electrical Final Passed
08/31/2026 COT - HCME - Mechanical Above Ceiling Passed
08/31/2026 COT - HCME - Mechanical Progress Passed
08/31/2026 COT - HCPL - Plumbing Above Ceiling Passed
08/31/2026 COT - HCBU - Interior Shear Bracing Passed
08/31/2026 PDSD Heavy Commercial Building Division Pre-Construction Meeting Passed
08/31/2026 COT - HCBU - CofO Passed