Permit: TC-COM-0125-00107
Permit Details
Status:
In Revision
Type:
Commercial Building
Address:
151 S GRANADA AV
Address NEW:
151 S GRANADA AV
Apply Date:
01/16/2025
Applicant:
Jack Donovan
Description:
Remodel Existing Sosa-Carillo House Associated wtih SD-1024-00104
Permit Reviews
Permit Number - TC-COM-0125-00107
Permit Status: In revision
Permit Description: Remodel Existing Sosa-Carillo House Associated wtih SD-1024-00104
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/03/2026 | COMMERCIAL REVIEW - FULL REVISION v.2 | N/A | IN REVIEW |
| 04/22/2025 | COMMERCIAL REVIEW - FULL v.3 | 04/25/2025 | REQUIRES RESUBMIT |
| 02/27/2025 | COMMERCIAL REVIEW - FULL v.2 | 03/28/2025 | REQUIRES RESUBMIT |
| 01/23/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 01/30/2026 | REQUIRES RESUBMIT |
| 08/19/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 09/04/2025 | APPROVED |
| 05/29/2025 | RESTAMP - COMMERCIAL v.1 | 06/02/2025 | APPROVED |
| 01/17/2025 | COMMERCIAL REVIEW - FULL v.1 | 02/10/2025 | REQUIRES RESUBMIT |
| 01/23/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/23/2026 | APPROVED |
| 05/14/2025 | COMMERCIAL REVIEW - FULL v.4 | 05/29/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0125-00107
Permit Status: In revision
Permit Description: Remodel Existing Sosa-Carillo House Associated wtih SD-1024-00104
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 01/26/2026 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
| 01/31/2025 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 01/31/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 01/31/2025 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
| 01/31/2025 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 01/31/2025 | SPECIAL INSPECTION FOR INSULATING CONCRETE FILL IS REQUIRED. |
| 01/31/2025 | ??? Designs must be submitted and approved prior to ... |
Conditions
Permit Number - TC-COM-0125-00107
Permit Status: In revision
Permit Description: Remodel Existing Sosa-Carillo House Associated wtih SD-1024-00104
| Date | Description | Comments |
|---|---|---|
| 06/02/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 01/26/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: In Revision
Permit Number: TC-COM-0125-00107
Permite Description: Remodel Existing Sosa-Carillo House Associated wtih SD-1024-00104
Total Outstanding Inspections - 15
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2025 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | In wall plumbing for restrooms and break room. |
| 12/08/2025 | COT - HCEL - Electrical Above Ceiling | N/A | Not Applicable | |
| 12/08/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 12/08/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 12/08/2025 | COT - HCME - Mechanical Above Ceiling | N/A | Not Applicable | |
| 12/08/2025 | COT - HCPL - Plumbing Above Ceiling | N/A | Not Applicable | |
| 12/08/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Partial pass 12/8/25 for west light poles |
| 12/08/2025 | COT - HCEL - Electrical Underground | N/A | Partial Pass | Partial pass 12/8/25 for west light poles |
| 12/08/2025 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | Partial pass 12/8/25 for west light poles |
| 01/22/2026 | COT - HCEL - Outdoor Lighting | N/A | Re-inspection required | 1/22/25: revision for changes to restrooms must be submitted and approved prior to approval. Water sterilization report required, Mirror in restrooms must be no higher than 40" to reflective surface, plumbing incomplete in mechanical room, exterior receptacles shall have appropriate covers at time of final inspection, all cover plates used on exterior of building must be weather rated, emergency lighting not per approved plans missing exit signs throughout (revision submitted 1/22/26 show same set up as original plan), carbon monoxide detector required in mechanical room, hardware at egress doors is none compliant keyed lock are not allowed per IBC 1010.1.9, site work is still in progress and accessible route is currently non compliant. INSPECTION STOPPED. |
| 01/22/2026 | COT - HCPL - Plumbing Final | N/A | Re-inspection required | 1/22/25: revision for changes to restrooms must be submitted and approved prior to approval. Water sterilization report required, Mirror in restrooms must be no higher than 40" to reflective surface, plumbing incomplete in mechanical room, exterior receptacles shall have appropriate covers at time of final inspection, all cover plates used on exterior of building must be weather rated, emergency lighting not per approved plans missing exit signs throughout (revision submitted 1/22/26 show same set up as original plan), carbon monoxide detector required in mechanical room, hardware at egress doors is none compliant keyed lock are not allowed per IBC 1010.1.9, site work is still in progress and accessible route is currently non compliant. INSPECTION STOPPED. |
| 01/22/2026 | COT - HCEL - Electrical Final | N/A | Re-inspection required | 1/22/25: revision for changes to restrooms must be submitted and approved prior to approval. Water sterilization report required, Mirror in restrooms must be no higher than 40" to reflective surface, plumbing incomplete in mechanical room, exterior receptacles shall have appropriate covers at time of final inspection, all cover plates used on exterior of building must be weather rated, emergency lighting not per approved plans missing exit signs throughout (revision submitted 1/22/26 show same set up as original plan), carbon monoxide detector required in mechanical room, hardware at egress doors is none compliant keyed lock are not allowed per IBC 1010.1.9, site work is still in progress and accessible route is currently non compliant. INSPECTION STOPPED. |
| 01/30/2026 | ENGR Engineering Final | N/A | Partial Pass | Okay for Level 4 TCO for Gem Show event. |
| 01/29/2026 | COT - HCBU - Building Final | N/A | Partial Pass | Partial pass. Pending other inspections. Provide address for building. 1/29/2026 |
| 01/29/2026 | COT - HCBU - CofO | N/A | Not Ready |
Completed Inspections
Permit Status: In Revision
Permit Number: TC-COM-0125-00107
Permit Description: Remodel Existing Sosa-Carillo House Associated wtih SD-1024-00104
Total Completed Inspections - 24
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2025 | COT - HCBU - Stem Wall/Retaining Wall | Passed | Reconstructed stem wall/footing in,four areas on West wall. Ok to place concrete in progress areas. | |
| 10/14/2025 | COT - HCPL - Plumbing Intermediate | Passed | In wall plumbing for new restroom | |
| 12/08/2025 | COT - HCEL - Electrical Intermediate | Passed | Passed in wall at new bathrooms and utility room 12/8/25 | |
| 12/08/2025 | COT - HCPL - Plumbing Progress | Passed | Passed in wall at new bathrooms and utility room 12/8/25 | |
| 12/08/2025 | COT - HCME - Mechanical Intermediate | Passed | Passed in wall at new bathrooms and utility room 12/8/25 | |
| 12/08/2025 | COT - HCBU - Framing | Passed | Passed in wall at new bathrooms and utility room 12/8/25 | |
| 12/08/2025 | COT - HCEL - Electrical Progress | Passed | Passed in wall at new bathrooms and utility room 12/8/25 | |
| 12/08/2025 | COT - HCME - Venting | Passed | Passed in wall at new bathrooms and utility room 12/8/25 | |
| 12/08/2025 | COT - HCME - Mechanical Progress | Passed | Passed in wall at new bathrooms and utility room 12/8/25 | |
| 01/22/2026 | COT - HCBU - Building Above Ceiling | Passed | ||
| 01/22/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 01/22/2026 | COT - HCBU - Roof Nailing | Passed | ||
| 01/22/2026 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 01/22/2026 | COT - HCBU - Preslab | Passed | ||
| 01/22/2026 | PDSD Heavy Commercial Building Division Pre-Construction Meeting | Passed | ||
| 01/22/2026 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 01/22/2026 | COT - HCEL - Electrical Underground | Passed | ||
| 01/22/2026 | COT - HCEL - Grounding/Bonding | Passed | ||
| 01/22/2026 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 01/26/2026 | COT - HCEL - Outdoor Lighting | Passed | ||
| 01/26/2026 | COT - HCPL - Plumbing Final | Passed | ||
| 01/26/2026 | COT - HCEL - Electrical Final | Passed | ||
| 01/28/2026 | COT - HCME - Mechanical Final | Passed | ||
| 01/29/2026 | COT - FCON - Fire - Final | Passed |