Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
01/02/2025
Applicant:
City of Tucson
Description:
Tarp CIP-0524-00017

Permit Reviews

Permit Number - TC-COM-0125-00003
Permit Status: Issued
Permit Description: Tarp CIP-0524-00017
Start Date Submittal Complete Date Status  
01/02/2025 COMMERCIAL REVIEW - LIMITED v.1 01/03/2025 APPROVED Review Details
01/03/2025 RESTAMP - COMMERCIAL v.1 01/15/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0125-00003
Permit Status: Issued
Permit Description: Tarp CIP-0524-00017
Total Outstanding Activity Conditions - 11
Date Name
01/03/2025 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
01/03/2025 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
01/03/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/03/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
01/03/2025 Final Foundation Design calculations and drawings are required prior to PRE-SLAB INSPECTION.
01/03/2025 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
01/03/2025 Post-Installed Anchor Inspection Report is required.
01/03/2025 SPECIAL INSPECTION FOR SOILS IS REQUIRED.
01/03/2025 SPECIAL INSPECTION FOR STEEL CONSTRUCTION IS REQUIRED.
01/03/2025 SPECIAL INSPECTION FOR STRUCTURAL ALUMINUM. IS REQUIRED.
01/03/2025 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.

Conditions

Permit Number - TC-COM-0125-00003
Permit Status: Issued
Permit Description: Tarp CIP-0524-00017
Date Description Comments
01/03/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/04/2025 Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-100 PECENT DRAWINGS_V1_V1.PDF DOCUMENTS VIEW