Permit: TC-COM-0124-00143
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
9999 N SHANNON RD
Address NEW:
9999 N SHANNON RD
Apply Date:
01/22/2024
Applicant:
Charles Sulik
Description:
Tucson Water Well Site Upgrade
Permit Reviews
Permit Number - TC-COM-0124-00143
Permit Status: Inspections complete
Permit Description: Tucson Water Well Site Upgrade
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/25/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/26/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0124-00143
Permit Status: Inspections complete
Permit Description: Tucson Water Well Site Upgrade
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 02/13/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 02/13/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
| 02/13/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
| 02/16/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0124-00143
Permite Description: Tucson Water Well Site Upgrade
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2024 | COT - LCBU - Building Progress | N/A | Partial Pass | Partial for the last lift top of bond beam at the control building, okay for grout placement. Pending reinforcement inspection of concrete roof (cast in place) |
| 02/20/2025 | BULD - Electrical Clearance | N/A | Not Applicable | duplicate |
| 02/20/2025 | COT - LCEL - Electrical Above Ceiling | N/A | Not Applicable | |
| 12/13/2024 | COT - LCEL - Electrical Underground | N/A | Partial Pass | Partial for the power and control conduits starting from the Control Building to the Chorine Building and to the Well Head, okay to backfill progress areas |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0124-00143
Permit Description: Tucson Water Well Site Upgrade
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/29/2024 | COT - LCEL - Grounding/Bonding | Passed | ||
| 08/19/2024 | COT - LCBU - Building Progress | Passed | Approved to top of bond beam for both Control Building and Perimeter wall, okay to grout and complete wall reinforcement/pre-grout inspection for this project | |
| 10/03/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | Approved roof and tank foundation per SI reports | |
| 02/20/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 03/25/2025 | COT - LCEL - Electrical Underground | Passed | ||
| 06/16/2025 | COT - LCEL - Outdoor Lighting | Passed | ||
| 06/16/2025 | COT - LCBU - Building Final | Passed | Approved and complete | |
| 06/16/2025 | COT - LCEL - Electrical Final | Passed | ||
| 06/16/2025 | COT - LCME - Mechanical Final | Passed | ||
| 06/16/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 06/16/2025 | ENGR Engineering Final | Passed | ||
| 03/02/2026 | TRSP - ROW - Final/Close-Out | Passed | Permit outside of the city of Tucson area and scope inspections not needed for a right of away from the city of Tucson |