Inspection Status: Passed
Inspection History: COT - LCEL - Electrical Underground
| Date |
Description |
Inspector |
Results |
Comments |
| 03/25/2025 |
COT - LCEL - Electrical Underground |
|
Passed |
|
| 05/22/2024 |
COT - LCEL - Electrical Underground |
|
Partial Pass |
Partial pass. 2 trenches approximately 30' for power and control out in field, outside of pad. Conduits for Pump control panel, air compressor control panel, station control panel, single phase 120-240 circuit breaker panel. Okay to backfill progress areas. Shading is required. 5/22/2024 |
| 06/21/2024 |
COT - LCEL - Electrical Underground |
|
Partial Pass |
Partial for the secondary conduit from the transformer location to the CT can location, okay to backfill progress areas |
| 12/13/2024 |
COT - LCEL - Electrical Underground |
|
Partial Pass |
Partial for the power and control conduits starting from the Control Building to the Chorine Building and to the Well Head, okay to backfill progress areas |