Permit: TC-COM-0124-00137
Permit Details
Apply Date:
01/22/2024
Applicant:
Salah Ba Geri
Description:
Structural Foundation and Superstructure Plans for the Staff Living Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review.
Permit Reviews
Permit Number - TC-COM-0124-00137
Permit Status: Issued
Permit Description: Structural Foundation and Superstructure Plans for the Staff Living Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/16/2024 | RESTAMP - COMMERCIAL v.1 | 04/18/2024 | APPROVED |
04/08/2024 | RESTAMP - COMMERCIAL v.1 | 04/10/2024 | APPROVED |
04/01/2024 | COMMERCIAL REVIEW - FULL v.2 | 04/08/2024 | APPROVED |
01/24/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/28/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0124-00137
Permit Status: Issued
Permit Description: Structural Foundation and Superstructure Plans for the Staff Living Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review.
Total Outstanding Activity Conditions - 10
Date | Name |
---|---|
04/08/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
04/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
04/08/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
04/08/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
04/08/2024 | Masonry Inspection Report submittal review is required. |
04/08/2024 | Post-Installed Anchor Inspection Report is required. |
04/08/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
04/08/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
04/08/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
04/08/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0124-00137
Permit Status: Issued
Permit Description: Structural Foundation and Superstructure Plans for the Staff Living Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review.
Date | Description | Comments |
---|---|---|
01/24/2024 | Please provide plans which contain the Building Number 2 associated with this permit. | |
04/10/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
04/10/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
01/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0124-00137
Permite Description: Structural Foundation and Superstructure Plans for the Staff Living Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review.
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/25/2024 | COT - HCPL - Rough Soil | N/A | Not Ready | |
08/19/2024 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | |
08/22/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Partial for staff living building line0.1/F-F.5 and G8.5-9 Ok to place concrete |