Permit: TC-COM-0124-00090
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
2 W VALENCIA RD
Address NEW:
2 W VALENCIA RD
Apply Date:
01/15/2024
Applicant:
Darin Mayer
Description:
Interior merchandising modification & maintenance to exist floor plan, NO area increase/structural-exterior buiding/site/fuel canopy/fuel installation/signage modifications
Permit Reviews
Permit Number - TC-COM-0124-00090
Permit Status: Inspections complete
Permit Description: Interior merchandising modification & maintenance to exist floor plan, NO area increase/structural-exterior buiding/site/fuel canopy/fuel installation/signage modifications
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/06/2024 | COMMERCIAL REVIEW - FULL v.2 | 06/10/2024 | APPROVED |
| 06/10/2024 | RESTAMP - COMMERCIAL v.1 | 06/12/2024 | APPROVED |
| 01/17/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/02/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0124-00090
Permit Status: Inspections complete
Permit Description: Interior merchandising modification & maintenance to exist floor plan, NO area increase/structural-exterior buiding/site/fuel canopy/fuel installation/signage modifications
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/25/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
| 02/02/2024 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0124-00090
Permit Status: Inspections complete
Permit Description: Interior merchandising modification & maintenance to exist floor plan, NO area increase/structural-exterior buiding/site/fuel canopy/fuel installation/signage modifications
| Date | Description | Comments |
|---|---|---|
| 01/17/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0124-00090
Permite Description: Interior merchandising modification & maintenance to exist floor plan, NO area increase/structural-exterior buiding/site/fuel canopy/fuel installation/signage modifications
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/04/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 02/04/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 02/12/2025 | COT - LCEL - Electrical Final | N/A | Re-inspection required | 2-12-25, provide new 30A/2P nonfused disconnect for water heater together with recirculation pump. |
| 02/12/2025 | COT - LCME - Mechanical Final | N/A | Re-inspection required | 2-12-25, provide new 30A/2P nonfused disconnect for water heater together with recirculation pump. |
| 02/12/2025 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | 2-12-25, provide new 30A/2P nonfused disconnect for water heater together with recirculation pump. |
| 02/12/2025 | COT - HCBU - CofO | N/A | Re-inspection required | 2-12-25, provide new 30A/2P nonfused disconnect for water heater together with recirculation pump. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0124-00090
Permit Description: Interior merchandising modification & maintenance to exist floor plan, NO area increase/structural-exterior buiding/site/fuel canopy/fuel installation/signage modifications
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2025 | COT - LCBU - Framing | Passed | 1/16/25: plumbing underground per plans and under pressure east half of building. Pending FS on North west side of building. Framing at East half of building for new non-bearing walls passed ok to proceed. Plumbing and electrical in wall on East half of building passed ok to proceed. 1/27/25: plumbing underground per plans and under pressure at west half of building. Ok to backfill. Framing at west side of building completed ok to proceed. Electrical in wall completed. |
|
| 01/27/2025 | COT - LCEL - Electrical Intermediate | Passed | 1/16/25: plumbing underground per plans and under pressure east half of building. Pending FS on North west side of building. Framing at East half of building for new non-bearing walls passed ok to proceed. Plumbing and electrical in wall on East half of building passed ok to proceed. 1/27/25: plumbing underground per plans and under pressure at west half of building. Ok to backfill. Framing at west side of building completed ok to proceed. Electrical in wall completed. |
|
| 01/27/2025 | COT - LCPL - Plumbing Intermediate | Passed | 1/16/25: plumbing underground per plans and under pressure east half of building. Pending FS on North west side of building. Framing at East half of building for new non-bearing walls passed ok to proceed. Plumbing and electrical in wall on East half of building passed ok to proceed. 1/27/25: plumbing underground per plans and under pressure at west half of building. Ok to backfill. Framing at west side of building completed ok to proceed. Electrical in wall completed. |
|
| 01/27/2025 | COT - LCPL - Rough Soil | Passed | 1/16/25: plumbing underground per plans and under pressure east half of building. Pending FS on North west side of building. Framing at East half of building for new non-bearing walls passed ok to proceed. Plumbing and electrical in wall on East half of building passed ok to proceed. 1/27/25: plumbing underground per plans and under pressure at west half of building. Ok to backfill. Framing at west side of building completed ok to proceed. Electrical in wall completed. |
|
| 02/04/2025 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 02/04/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 02/12/2025 | COT - FCON - Fire - Final | Passed | ||
| 03/26/2025 | COT - LCBU - Building Final | Passed | 2-12-25, provide new 30A/2P nonfused disconnect for water heater together with recirculation pump. 3/26/25: passed. Pending conditions. |
|
| 03/26/2025 | COT - LCEL - Electrical Final | Passed | ||
| 03/26/2025 | COT - LCME - Mechanical Final | Passed | ||
| 03/26/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 03/26/2025 | COT - HCBU - CofO | Passed |