Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCBU - CofO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2025 | COT - HCBU - CofO | Re-inspection required | 2-12-25, provide new 30A/2P nonfused disconnect for water heater together with recirculation pump. | |
| 03/26/2025 | COT - HCBU - CofO | Passed |