Permit: TC-COM-0124-00048
Permit Details
Apply Date:
01/09/2024
Applicant:
Susan Carlson-Herdt
Description:
Install PV Solar parking canopies . 300.78 DC Kw / 232.00 AC Kw
Permit Reviews
Permit Number - TC-COM-0124-00048
Permit Status: Complete
Permit Description: Install PV Solar parking canopies .
300.78 DC Kw / 232.00 AC Kw
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/13/2024 | APPROVED |
05/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/09/2024 | REQUIRES RESUBMIT |
05/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/30/2024 | APPROVED |
01/09/2024 | COMMERCIAL REVIEW - FULL v.1 | 01/10/2024 | REQUIRES RESUBMIT |
01/10/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/09/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0124-00048
Permit Status: Complete
Permit Description: Install PV Solar parking canopies .
300.78 DC Kw / 232.00 AC Kw
Date | Description | Comments |
---|---|---|
02/09/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
02/09/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
02/09/2024 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
02/09/2024 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. | |
02/09/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0124-00048
Permit Description: Install PV Solar parking canopies .
300.78 DC Kw / 232.00 AC Kw
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/02/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | Footings for canopies A + B ok to pour. | |
04/11/2024 | COT - CSOL - Electrical Underground Solar Project | Passed | ||
04/25/2024 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
04/30/2024 | COT - CSOL - Grounding/Bonding Solar Project | Passed | Canopies 1 + 2 | |
04/30/2024 | COT - CSOL - Outdoor Lighting Solar Project | Passed | ||
05/09/2024 | COT - CSOL - Electrical Final Solar Project | Passed | 5/9/24: Breaker at existing switchgear per plan ok to energize DGL. | |
05/10/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
05/10/2024 | ENGR Engineering Final | Passed | ||
05/10/2024 | COT - LCEL - Electrical Final | Passed | ||
05/10/2024 | COT - LCBU - Building Final | Passed |