Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 04/26/2024 |
BULD - Electrical Clearance |
|
Not Ready |
|
| 05/09/2024 |
BULD - Electrical Clearance |
|
Passed |
5/9/24: Breaker at existing switchgear per plan ok to energize DGL. |
| 05/10/2024 |
BULD - Electrical Clearance |
|
Passed |
Approved, DGC Clearance to TEP is required for the solar meter |