Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address NEW:
10032 N THORNYDALE RD
Apply Date:
01/05/2024
Applicant:
Joseph Alwin
Description:
Control Building for housing Station Control Panel and other electronics associated with the Well Site.

Permit Reviews

Permit Number - TC-COM-0124-00031
Permit Status: Inspections complete
Permit Description: Control Building for housing Station Control Panel and other electronics associated with the Well Site.
Start Date Submittal Complete Date Status  
01/08/2024 COMMERCIAL REVIEW - FULL v.1 01/08/2024 REQUIRES RESUBMIT Review Details
05/01/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 05/01/2025 APPROVED Review Details
03/25/2024 COMMERCIAL REVIEW - FULL v.3 03/25/2024 APPROVED Review Details
01/16/2024 COMMERCIAL REVIEW - FULL v.1 01/30/2024 REQUIRES RESUBMIT Review Details
03/25/2024 RESTAMP - COMMERCIAL v.1 03/28/2024 APPROVED Review Details
04/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/24/2025 REQUIRES RESUBMIT Review Details
03/05/2024 COMMERCIAL REVIEW - FULL v.2 03/21/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0124-00031
Permit Status: Inspections complete
Permit Description: Control Building for housing Station Control Panel and other electronics associated with the Well Site.
Date Description Comments
01/29/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
01/29/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/29/2024 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.
01/29/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
01/29/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/29/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0124-00031
Permite Description: Control Building for housing Station Control Panel and other electronics associated with the Well Site.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
10/15/2024 COT - LCEL - Electrical Above Ceiling N/A Not Applicable
04/24/2025 COT - FCON - Fire - Final N/A Not Applicable
10/15/2024 COT - LCEL - Electrical Intermediate N/A Not Ready
10/15/2024 COT - LCEL - Electrical Progress N/A Not Ready
10/15/2024 COT - LCEL - Outdoor Lighting N/A Not Ready

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0124-00031
Permit Description: Control Building for housing Station Control Panel and other electronics associated with the Well Site.
Total Completed Inspections - 15
Date Description Inspector Results Comments
06/04/2024 COT - LCEL - Grounding/Bonding Passed #6 bare to panel A, #6 bare to transformer, #6 bare for A.C, #6 bare for well pump panel, #6 bare for station control panel, and 1/0 for radio. 6/4/2024
06/24/2024 COT - LCBU - Excavation/Rebar/Zoning Passed 6/24/24 - 10' x 10' equipment slab rebar, grounding, and location ok to pour.
09/19/2024 COT - LCEL - Electrical Underground Passed
10/15/2024 BULD - Electrical Clearance Passed Approved 400A 3-phase service panel - ECO Clearance to TEP is required for M-2 panel
Pending finals
04/24/2025 COT - LCEL - Electrical Final Passed
04/24/2025 COT - LCME - Mechanical Final Passed
04/24/2025 COT - LCPL - Plumbing Final Passed
04/24/2025 ENGR Engineering Final Passed Site is in accordance with plans. C of O ready.
03/02/2026 TRSP - ROW - Notice of Completion Passed Permit outside of the city of Tucson area and scope inspections not needed for a right of away from the city of Tucson
04/24/2025 COT - LCBU - Framing Passed
04/24/2025 COT - LCPL - Plumbing Intermediate Passed
04/24/2025 COT - LCEL - Electrical Intermediate Passed
04/24/2025 COT - LCPL - Yard Water Line Passed
04/24/2025 COT - LCEL - Outdoor Lighting Passed
05/12/2025 COT - LCBU - Building Final Passed Approved project, pending ROW approvals

Documents

File Name Document Type  
24-05-22 608313001 TJL 2024-05-23 170814670_V1.PDF DOCUMENTS VIEW
EQUIP WELL C-117B_COT SPECIAL_INSPECTION FORM_FINAL SIC 03-06-25-2025-04-30_V2.PDF DOCUMENTS VIEW
SPAPP-24-137 INSPECTION CLARIFICATION 04-30-25-2025-04-30_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANS_C-117B_OASIS-RESERVOIR_100PCT_20240322_V3.PDF DOCUMENTS VIEW