Permit: TC-COM-0124-00031
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
10032 N THORNYDALE RD
Address NEW:
10032 N THORNYDALE RD
Apply Date:
01/05/2024
Applicant:
Joseph Alwin
Description:
Control Building for housing Station Control Panel and other electronics associated with the Well Site.
Permit Reviews
Permit Number - TC-COM-0124-00031
Permit Status: Inspections complete
Permit Description: Control Building for housing Station Control Panel and other electronics associated with the Well Site.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/08/2024 | COMMERCIAL REVIEW - FULL v.1 | 01/08/2024 | REQUIRES RESUBMIT |
| 05/01/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/01/2025 | APPROVED |
| 03/25/2024 | COMMERCIAL REVIEW - FULL v.3 | 03/25/2024 | APPROVED |
| 01/16/2024 | COMMERCIAL REVIEW - FULL v.1 | 01/30/2024 | REQUIRES RESUBMIT |
| 03/25/2024 | RESTAMP - COMMERCIAL v.1 | 03/28/2024 | APPROVED |
| 04/23/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/24/2025 | REQUIRES RESUBMIT |
| 03/05/2024 | COMMERCIAL REVIEW - FULL v.2 | 03/21/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0124-00031
Permit Status: Inspections complete
Permit Description: Control Building for housing Station Control Panel and other electronics associated with the Well Site.
| Date | Description | Comments |
|---|---|---|
| 01/29/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 01/29/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 01/29/2024 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
| 01/29/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 01/29/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 01/29/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0124-00031
Permite Description: Control Building for housing Station Control Panel and other electronics associated with the Well Site.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2024 | COT - LCEL - Electrical Above Ceiling | N/A | Not Applicable | |
| 04/24/2025 | COT - FCON - Fire - Final | N/A | Not Applicable | |
| 10/15/2024 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | |
| 10/15/2024 | COT - LCEL - Electrical Progress | N/A | Not Ready | |
| 10/15/2024 | COT - LCEL - Outdoor Lighting | N/A | Not Ready |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0124-00031
Permit Description: Control Building for housing Station Control Panel and other electronics associated with the Well Site.
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2024 | COT - LCEL - Grounding/Bonding | Passed | #6 bare to panel A, #6 bare to transformer, #6 bare for A.C, #6 bare for well pump panel, #6 bare for station control panel, and 1/0 for radio. 6/4/2024 | |
| 06/24/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 6/24/24 - 10' x 10' equipment slab rebar, grounding, and location ok to pour. | |
| 09/19/2024 | COT - LCEL - Electrical Underground | Passed | ||
| 10/15/2024 | BULD - Electrical Clearance | Passed | Approved 400A 3-phase service panel - ECO Clearance to TEP is required for M-2 panel Pending finals |
|
| 04/24/2025 | COT - LCEL - Electrical Final | Passed | ||
| 04/24/2025 | COT - LCME - Mechanical Final | Passed | ||
| 04/24/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 04/24/2025 | ENGR Engineering Final | Passed | Site is in accordance with plans. C of O ready. | |
| 03/02/2026 | TRSP - ROW - Notice of Completion | Passed | Permit outside of the city of Tucson area and scope inspections not needed for a right of away from the city of Tucson | |
| 04/24/2025 | COT - LCBU - Framing | Passed | ||
| 04/24/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 04/24/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 04/24/2025 | COT - LCPL - Yard Water Line | Passed | ||
| 04/24/2025 | COT - LCEL - Outdoor Lighting | Passed | ||
| 05/12/2025 | COT - LCBU - Building Final | Passed | Approved project, pending ROW approvals |