Inspection Status: Partial Pass

Inspection History: COT - LCEL - Electrical Underground 

Date Description Inspector Results Comments
06/04/2024 COT - LCEL - Electrical Underground  Partial Pass Partial pass. X3Conduits going to chlorination building(1", 3/4", 1 1/2"). (1 1/2", 1", 3/4") to pedestal, flow meter, and thermostat. X2 1" to light poles. 3/4" intrusion for gate. Single 2 1/2" to motor well pump. X2 1" for spares from SEP (station control panel) and well pump panel. Pending change order for fiber optics conduits. Okay to backfill progress areas. 6/4/2024
07/03/2024 COT - LCEL - Electrical Underground  Partial Pass Partial pass. X3Conduits going to chlorination building(1", 3/4", 1 1/2"). (1 1/2", 1", 3/4") to pedestal, flow meter, and thermostat. X2 1" to light poles. 3/4" intrusion for gate. Single 2 1/2" to motor well pump. X2 1" for spares from SEP (station control panel) and well pump panel. Pending change order for fiber optics conduits. Okay to backfill progress areas. 6/4/2024
7/3/24: partial pass for (2)3" conduit from control building to disconnect box at pole, ok to backfill progress areas,
09/19/2024 COT - LCEL - Electrical Underground  Passed