Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0124-00019
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
7525 E SPEEDWAY BL
Address NEW:
7525 E SPEEDWAY BL
Apply Date:
01/04/2024
Applicant:
Arthur Schlegel
Description:
2nd Party - New dug outs and batting gage for the approved DP planTD-DEV-0423-00224 softball field
Permit Reviews
Permit Number - TC-COM-0124-00019
Permit Status: Issued
Permit Description: 2nd Party - New dug outs and batting gage for the approved DP planTD-DEV-0423-00224 softball field
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/05/2024 | COMMERCIAL REVIEW - FULL v.1 | 01/05/2024 | REQUIRES RESUBMIT |
| 02/21/2024 | COMMERCIAL REVIEW - FULL v.3 | 03/01/2024 | REQUIRES RESUBMIT |
| 04/07/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/15/2025 | REQUIRES RESUBMIT |
| 03/07/2024 | COMMERCIAL REVIEW - FULL v.4 | 03/20/2024 | APPROVED |
| 04/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/01/2025 | APPROVED |
| 03/20/2024 | RESTAMP - COMMERCIAL v.1 | 03/25/2024 | APPROVED |
| 01/05/2024 | COMMERCIAL REVIEW - FULL v.2 | 02/01/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0124-00019
Permit Status: Issued
Permit Description: 2nd Party - New dug outs and batting gage for the approved DP planTD-DEV-0423-00224 softball field
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 03/20/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 03/20/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 03/20/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
| 03/20/2024 | Pre-Engineered metal building fabrication and erection drawings must be submitted and approved prior to final. |
| 03/20/2024 | Post-Installed Anchor Inspection Report is required. |
Conditions
Permit Number - TC-COM-0124-00019
Permit Status: Issued
Permit Description: 2nd Party - New dug outs and batting gage for the approved DP planTD-DEV-0423-00224 softball field
| Date | Description | Comments |
|---|---|---|
| 03/20/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 01/05/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/20/2024 | Masonry Inspection Report submittal review is required. | |
| 06/04/2024 | Sewer Receipt/Wastewater Utility Fee | |
| 03/20/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 03/20/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 03/20/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 03/20/2024 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0124-00019
Permite Description: 2nd Party - New dug outs and batting gage for the approved DP planTD-DEV-0423-00224 softball field
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 05/31/2024 | COT - HCEL - Grounding/Bonding | N/A | Not Applicable | |
| 05/31/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 05/31/2024 | COT - HCEL - Outdoor Lighting | N/A | Not Applicable | |
| 07/09/2024 | COT - FCON - Fire - Final | N/A | Not Applicable | |
| 08/07/2024 | COT - HCBU - TCO | N/A | Not Ready | |
| 09/19/2024 | COT - HCEL - Electrical Final | N/A | Not Ready | Scheduled to view inspection history and schedule other inspections at request of builder. |
| 01/07/2025 | ENGR Engineering Final | N/A | Partial Pass | Contractor has not installed. The dugout outside will be installed at another time. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0124-00019
Permit Description: 2nd Party - New dug outs and batting gage for the approved DP planTD-DEV-0423-00224 softball field
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2024 | COT - HCBU - Preslab | Passed | Footings for batting cages. | |
| 05/31/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 05/31/2024 | COT - HCBU - Framing | Passed | ||
| 09/30/2024 | COT - HCEL - Electrical Underground | Passed | ||
| 09/30/2024 | COT - HCBU - TCO | Passed | ||
| 02/24/2025 | COT - HCEL - Electrical Final | Passed | ||
| 02/24/2025 | ENGR Engineering Final | Passed | ||
| 02/25/2025 | COT - HCBU - Building Final | Passed | ||
| 02/25/2025 | TRSP - ROW - Final/Close-Out | Passed |