Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
1620 W VALENCIA RD
Apply Date:
01/24/2023
Applicant:
Brandy Burke
Description:
Demo of an existing Taco Bell and Construction of a new Taco Bell.

Permit Reviews

Permit Number - TC-COM-0123-00534
Permit Status: Complete
Permit Description: Demo of an existing Taco Bell and Construction of a new Taco Bell.
Start Date Submittal Complete Date Status  
05/23/2023 COMMERCIAL REVIEW - FULL v.3 06/08/2023 REQUIRES RESUBMIT Review Details
02/09/2023 COMMERCIAL REVIEW - FULL v.1 03/07/2023 REQUIRES RESUBMIT Review Details
12/18/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/21/2023 APPROVED Review Details
12/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/23/2023 APPROVED Review Details
04/20/2023 COMMERCIAL REVIEW - FULL v.2 05/18/2023 REQUIRES RESUBMIT Review Details
07/18/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/24/2023 APPROVED Review Details
12/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/15/2023 APPROVED Review Details
06/30/2023 COMMERCIAL REVIEW - FULL v.4 07/13/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0123-00534
Permit Status: Complete
Permit Description: Demo of an existing Taco Bell and Construction of a new Taco Bell.
Date Description Comments
05/26/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
12/22/2023 PASSED - Backflow Assembly Test Report
12/15/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/26/2023 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
12/15/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/26/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
05/26/2023 Kitchen Hood Fire Suppression Designs must be submitted and approved prior to final.
12/15/2023 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
05/26/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/26/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
05/26/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0123-00534
Permite Description: Demo of an existing Taco Bell and Construction of a new Taco Bell.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
11/02/2023 COT - HCEL - Electrical Above Ceiling N/A Partial Pass Partial pass. Soffit at dining area and soda machine, west wall. Okay to proceed progress areas. 11/2/2023
11/15/2023 COT - HCME - Mechanical Intermediate N/A Partial Pass 11/15/23: 1st smoke test on the grease duct passed.
09/01/2023 COT - HCEL - Grounding/Bonding N/A Partial Pass 9/1/23 Partial approval for you for connections under slab
12/08/2023 COT - HCPL - Backwater Valve N/A Not Applicable
09/15/2023 COT - HCEL - Outdoor Lighting N/A Not Ready wanted light pole bases.
COT - FCON - Hood System - Final N/A Not Ready Called in wrong inspection.
12/22/2023 COT - HCBU - Building Final N/A Partial Pass okay for level 4 TCO

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0123-00534
Permit Description: Demo of an existing Taco Bell and Construction of a new Taco Bell.
Total Completed Inspections - 38
Date Description Inspector Results Comments
08/30/2023 COT - HCBU - Preslab Passed 8/30/23: all passed ready to pour
09/06/2023 COT - HCPL - Yard Water Line Passed 9/6/23: ok to backfill
09/06/2023 COT - HCPL - Sewer Passed 9/6/23: connection from grease trap to sewer ok to backfill
09/12/2023 COT - HCBU - Stem Wall/Retaining Wall Passed
09/15/2023 COT - HCBU - Excavation/Rebar/Zoning Passed Light pole bases.
10/02/2023 COT - HCBU - Roof Nailing Passed
10/02/2023 COT - HCBU - Exterior Clips/Sheathing Passed
10/13/2023 COT - HCBU - Building Progress Passed Sheathing on pop outs.
10/20/2023 COT - HCEL - Electrical Underground Passed 10/20/23: Electrical underground into directional sign on north east per plan, canopy, menu board, speaker all electrical underground per plan.
10/20/2023 COT - HCPL - Rough Soil Passed 8/21/23 under slab complete to first clean out ok to backfill
8/28/23 rough soil for grease trap and site vent and waste lines, ok to cover
10/20/23: Electrical underground into directional sign on north east per plan, canopy, menu board, speaker all electrical underground per plan.
10/31/2023 COT - HCBU - Framing Passed
10/31/2023 COT - HCEL - Electrical Intermediate Passed
10/31/2023 COT - HCPL - Plumbing Intermediate Passed
10/31/2023 COT - HCPL - Gas Pressure Test Passed
10/31/2023 COT - HCME - Venting Passed
10/30/2023 COT - HCBU - Firewall/Fire Barrier/Firestop Passed 10/30/23: firewall at kitchen hood passed ok to proceed
11/02/2023 COT - HCBU - Interior Shear Bracing Passed 11/2/2023. All drywall in place okay for tape and mud.
11/16/2023 COT - HCPL - Plumbing Above Ceiling Passed
12/05/2023 COT - HCBU - Building Above Ceiling Passed
12/05/2023 COT - HCEL - Electrical Above Ceiling Passed
12/05/2023 COT - HCME - Mechanical Above Ceiling Passed
12/08/2023 COT - HCME - Mechanical Intermediate Passed
12/08/2023 COT - HCEL - Grounding/Bonding Passed
12/08/2023 BULD - Electrical Clearance Passed 12/8/23: ECO TEP Clearance
12/08/2023 COT - HCPL - Plumbing Roof Drains Passed
12/08/2023 COT - BULD - SWG Clearance Passed 12/8/23: SWG CLEARANCE meter tag.
TRSP - ROW - Final/Close-Out Passed
12/18/2023 COT - HCPL - Plumbing Final Passed
12/18/2023 COT - HCME - Mechanical Final Passed
12/18/2023 COT - HCEL - Electrical Final Passed
12/18/2023 COT - HCEL - Outdoor Lighting Passed
12/18/2023 COT - HCPL - Gas Final Passed
12/22/2023 COT - FCON - Fire - Final Passed
12/19/2023 COT - FCON - Hood System - Final Passed
01/17/2024 ENGR Engineering Final Passed
01/17/2024 COT - HCBU - CofO Passed
01/17/2024 COT - HCBU - Building Final Passed
01/17/2024 PDSD Heavy Commercial Building Division Pre-Construction Meeting Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
BACKFLOW 12.18.23_V1.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERTIFICATE - TACOBOCCI SIGNED - TACO BELL VALENCIA FINAL-2023-12-18_V1.PDF DOCUMENTS VIEW
TACO BELL VALENCIA - REPORT_V1.PDF DOCUMENTS VIEW
TACO BELL VALENCIA WATER STERILIZATION RESULTS-2023-12-18_V1.PDF DOCUMENTS VIEW
TACO BELL VALENCIA FINAL-2023-12-13_V1.PDF DOCUMENTS VIEW
TRUSS SUBMITTAL_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-3-PLAN SET_V3_V1.PDF DOCUMENTS VIEW
19669_TACO BOCCI_VALENCIA_MECHANICAL COMCHECK_V1.PDF DOCUMENTS VIEW
19669_TACO BOCCI_VALENCIA_SPECIFICATIONS_V1.PDF DOCUMENTS VIEW
19669_TACO BOCCI_VALENCIA_STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
19669_TACO BOCCI_VALENCIA_STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
19669_TACO BOCCI_VALENCIA_SYSTEMS DESIGN REPORT_V1.PDF DOCUMENTS VIEW