Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/05/2023
Applicant:
parth vijayvergiya
Description:
This project will replace the existing X-Ray equipment with new X-Ray equipment on the first floor of the hospital. The project will also include new interior finishes, electrical and HVAC ceiling fixtures, and plumbing for a new hand wash sink.

Permit Reviews

Permit Number - TC-COM-0123-00423
Permit Status: Complete
Permit Description: This project will replace the existing X-Ray equipment with new X-Ray equipment on the first floor of the hospital. The project will also include new interior finishes, electrical and HVAC ceiling fixtures, and plumbing for a new hand wash sink.
Start Date Submittal Complete Date Status  
05/25/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/02/2023 APPROVED Review Details
01/10/2023 COMMERCIAL REVIEW - FULL v.1 01/31/2023 REQUIRES RESUBMIT Review Details
03/06/2023 COMMERCIAL REVIEW - FULL v.2 03/20/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0123-00423
Permit Status: Complete
Permit Description: This project will replace the existing X-Ray equipment with new X-Ray equipment on the first floor of the hospital. The project will also include new interior finishes, electrical and HVAC ceiling fixtures, and plumbing for a new hand wash sink.
Date Description Comments
03/15/2023 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
03/20/2023 Contractor's active Arizona Contractor's License number for specified scope of work required prior to issuance of permit.
03/15/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0123-00423
Permit Description: This project will replace the existing X-Ray equipment with new X-Ray equipment on the first floor of the hospital. The project will also include new interior finishes, electrical and HVAC ceiling fixtures, and plumbing for a new hand wash sink.
Total Completed Inspections - 6
Date Description Inspector Results Comments
03/29/2023 COT - HCEL - Electrical Underground Passed Under floor electric complete from j-box to equipment location in x-ray room. Okay to backfill and replace concrete floor.
04/27/2023 COT - HCBU - Building Above Ceiling Passed
05/23/2023 ENGR Engineering Final Passed
05/25/2023 COT - HCBU - Building Progress Passed
05/26/2023 COT - HCBU - Building Final Passed
06/06/2023 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
P22.200_BUMCT X-RAY B_SPECIAL_INSPECTION_CERTIFICATE_FINAL-2023-05-24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_COMMENT RESPONSE LETTER_TC-COM-0123-00423-BUMCT X-RAY REPLACEMENT_CITY COMMENTS 1_V1.PDF DOCUMENTS VIEW
20230118_ASI01_V1.PDF DOCUMENTS VIEW
CONS-2_PLANSET_BUMCT X-RAY EQUIPMENT REPLACEMENT_CITY REVIEW_V2.PDF DOCUMENTS VIEW
2023.01.03_BUMC T X-RAY B CALCULATIONS_V1.PDF DOCUMENTS VIEW
2023.01.03_BUMC-T X-RAY B_SPECIAL_INSPECTION_CERTIFICATE-2023-01-05_V1.PDF DOCUMENTS VIEW