Permit Details

Status:
Complete
Type:
Certificate of Occupancy
Apply Date:
08/16/2024
Applicant:
chad greco
Description:
THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-CFO-0824-00171
Permite Description: THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/21/2024 Consultation SITE N/A Partial Pass Building and Fire will sign off on the interior of the building. Exterior still needs, signage to be completed, temp fencing removed and a set of approved plans.

Completed Inspections

Permit Status: Complete
Permit Number: TC-CFO-0824-00171
Permit Description: THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/13/2024 COT - HCBU - TCO Passed